background image

6

2.4 Installing the unit

Installation

GUIDE

Tools required

• Phillips #2 or Robertson #1 

screwdriver

• 3/32” drill bit

• Tin snips or metal shear

• Power Drill

Location

Return side connections is to be installed

after the last branch on the return air

plenum and minimum 2 linear ft distance

from furnace. 

A 5-ft power cord is supplied with the

unit.  If n ot  available  a  120VAC  outlet

needs to be supplied.

Note:

Refer to the Owner’s Operation Guide

(p.9) for details on how to  remove the

unit’s door and filters

Step by step Installation

Steps involved in the preparation of the plenum mount system are

as followed:

figure 2.2b

-One cut permits the clean

removal of the insulation piece.

Step 2:

Preparing ducting flairs

Remove the door and filters and proceed to

cut the insulation as illustrated below.

figure 2.2a -

Cut the insulation along the inside

edge of both inlet and outlet ports to remove

the insulation from the port openings.

Step 1: 

Preparing return air plenum

Find a location that satisfies both service and

maintenance requirements and proceed to cut

holes as illustrated below. 

figure 2.1a - 

Tape template to return air

plenum. Cut opening with metal shears and

predrill for the securing screws.

figure 2.1b - 

Remove template.

figure 2.2c 

-The unit should look like this

when the foam piece is removed.

Отзывы: