Model 580A
34
7.8 Sample Calibration Schedule and Checklist
To perform a Calibration Check or Calibration, refer to Sections 3.4 and 3.5.
Sensor Serial Number
Location
___________________ _____________________
1. Installation and Preliminary calibration.
Record date after preliminary calibration is
done.
Date: __________________
2. 24-hour calibration. Record date after 24-
hour calibration is done.
Date: __________________
3. 7-day calibration check Record date and
reading of calibration check.
Date/Reading Date/Reading Date/Reading
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
4. 14-day calibration check Record date and
reading of calibration check.
Date/Reading Date/Reading Date/Reading
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
5. 30-day calibration check. Record date and
reading of calibration check.
Date/Reading Date/Reading Date/Reading
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
6. 60-day months calibration check. Record
date and reading of calibration check.
Date/Reading Date/Reading Date/Reading
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
7. 90-day calibration check.
Date/Reading Date/Reading Date/Reading
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
____ ____ ____ ____ ____ ____
Table 12: Calibration Schedule