5.

Set the generator main circuit breaker to ON or
CLOSED. The generator now powers all LOAD
circuits. Check generator operation under load as
follows:

Turn on electrical loads to the full rated
wattage/amperage capacity of the generator.
DO NOT OVERLOAD.

With maximum rated load applied, check
voltage and frequency across transfer switch
terminals E1 and E2. Voltage should be
greater than 230 VAC (240 VAC system);
frequency should be greater than 59 Hz.

Verify that the gas pressure remains within
acceptable parameters (see the generator
Installation manual).

Let the generator run under rated load for at
least 30 minutes. With unit running, watch for
unusual noises, vibration, or overheating that
might indicate a problem.

6.

When checkout under load is complete, set main
circuit breaker of the generator to the OFF or
OPEN position.

7.

Let the generator run at no-load for several minutes.
Then, shut down by selecting the OFF mode.

8.

Move the main switch contacts back to the utility
position. 

NOTE: 

See 

Manual Operation

. Handle and operating

lever of transfer switch should be in down position.

9.

Set the utility service disconnect circuit breaker of
the transfer switch to ON or CLOSED.

10.

The system is now set for fully automatic operation.

Checking Automatic Operation

To check the system for proper automatic operation,
proceed as follows:

1.

Verify generator is OFF.

2.

Set the utility service disconnect circuit breaker of
the transfer switch to OFF or OPEN.

3.

Verify switch is de-energized.

4.

Install front cover of the transfer switch.

5.

Set the utility service disconnect circuit breaker of
the transfer switch to ON or CLOSED.

6.

Set the generator main circuit breaker to ON.

7.

On the generator panel, select AUTO. The system
is now ready for automatic operation.

8.

Set the utility service disconnect circuit breaker of
the transfer switch to OFF or OPEN.

With the generator ready for automatic operation, the
engine should crank and start when the utility source
power is turned OFF after a five second delay (factory
default setting). After starting, the transfer switch should
connect load circuits to the standby side after a five (5)

second warm-up delay. Let the system operate through
its entire automatic sequence of operation.

NOTE: 

Timer durations may differ between generators

and settings.

With the generator running and loads powered by
generator AC output, set the utility service disconnect
circuit breaker of the transfer switch to ON or CLOSED.
The following should occur:

After approximately 15 seconds, the switch should
transfer loads back to the utility power source.

Approximately one minute after re-transfer, the
generator should shut down.

With the generator in the AUTOMATIC mode, the system
is now set for fully automatic operation.

Installation Summary

1.

Verify the installation has been properly performed
as outlined by the manufacturer and that it meets
all applicable laws and codes.

2.

Verify proper operation of the system as outlined in
the appropriate installation and owner’s manuals.

3.

Educate the end-user on the proper operation,
maintenance and service call procedures.

NOTE: 

The Utility Power Circuit Breaker in the transfer

switch must be turned OFF to simulate a utility outage.
Shutting off the main disconnect in a subpanel connected
to the transfer switch will NOT simulate an outage. 

Shutting Generator Down While 

Under Load Or During A Utility 

Outage

IMPORTANT NOTE

: To avoid equipment damage, follow

these steps, in order, during utility outages. Shutdowns
may be required during utility outages to perform routine
maintenance or to conserve fuel.

To turn the generator OFF:

1.

Set the main utility disconnect to OFF (OPEN).

2.

Set the generator MLCB (generator disconnect) to
OFF (OPEN).

3.

Allow the generator to run for a cool-down period of
approximately one minute.

4.

At the controller, set the generator to OFF.

5.

Remove the 7.5A fuse from the controller.

To turn the generator back ON:

1.

Install 7.5A fuse in controller.

Automatic start-up. Disconnect utility power and 
render unit inoperable before working on unit. 
Failure to do so will result in death or serious injury.

(000191)

DANGER

Содержание RXSC100A3

Страница 1: ...Utility Service Circuit Breaker RXSW200A3 Service Entrance Rated with Utility Service Circuit Breaker RXSC200A3 SERIAL NUMBER _________________________ DATE PURCHASED ________________________ WWW GEN...

Страница 2: ...alates and lead which are known to the State of California to cause cancer and birth defects or other reproductive harm To minimize exposure avoid breathing exhaust do not idle the engine except as ne...

Страница 3: ...ault Current Label 13 Section 4 Operation Functional Tests and Adjustments 15 Manual Operation 15 Close to Utility Source Side 15 Close to Generator Source Side 16 Return to Utility Source Side 16 Vol...

Страница 4: ...iv Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Страница 5: ...that might involve a hazard The warnings in this manual and on tags and decals affixed to the unit are therefore not all inclusive If using a procedure work method or operating technique that the man...

Страница 6: ...the transfer switch Failure to do so will result in death or serious injury 000157 DANGER Electrocution Do not disable or modify the connection box door safety switch Doing so will result in death or...

Страница 7: ...efore working on utility connections of the transfer switch Failure to do so will result in death or serious injury 000104 DANGER Electrocution Water contact with a power source if not avoided will re...

Страница 8: ...Safety 4 Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Страница 9: ...a single phase system when the single phase neutral line is to be connected to a neutral lug and is not to be switched Solderless screw type terminal lugs are standard The conductor size range is as...

Страница 10: ...ion against falling rain and sleet are undamaged by the formation of ice on the enclosure Safe Use of Transfer Switch Before installing operating or servicing this equipment read the Safety Rules care...

Страница 11: ...al of eight loads Use Priorities A C 1 4 on the SACM as the top priorities then up to four SMMs as Priorities 5 8 Use only select A C priorities on the SACM as the top priorities then use additional S...

Страница 12: ...General Information 8 Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Страница 13: ...he transfer switch as close as possible to the electrical loads that are to be connected to it Mount the switch vertically to a rigid supporting structure To prevent switch distortion level all mounti...

Страница 14: ...on the 75 C column of tables charts etc used to size conductors The installation must comply fully with all applicable codes standards and regulations Knockouts into the transfer switch can be made i...

Страница 15: ...insulation rating equal to at least the maximum circuit voltage applied to any conductor within the equipment cable or conduit See NEC 300 3 C 1 Connecting SACM See Figure 3 3 The SACM can control an...

Страница 16: ...2 D Air Conditioner 2 E Thermostat 3 F Air Conditioner 3 G Thermostat 4 H Air Conditioner 4 T1 fused Battery Charge N1 fused Utility Sense N2 fused Utility Sense 0 DC Ground 194 12 VDC 23 Transfer Co...

Страница 17: ...ining the unit Owner s Manual and transfer switch manual operating handle The 2017 NEC requires that the short circuit current rating of the transfer equipment based on the type of overcurrent protect...

Страница 18: ...Installation 14 Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Страница 19: ...can be viewed through the long narrow slot in the inside cover The top of the movable contact carrier arm is yellow to be easily identified Manual operation handle in the UP position LOAD terminals T...

Страница 20: ...1 to its ON or CLOSED position 4 With an accurate AC voltmeter and frequency meter check the no load voltage and frequency Measure across ATS terminal lugs E1 to E2 E1 to NEUTRAL and E2 to NEUTRAL 5 W...

Страница 21: ...nd start when the utility source power is turned OFF after a five second delay factory default setting After starting the transfer switch should connect load circuits to the standby side after a five...

Страница 22: ...tility supply to the ATS 2 Verify managed loads are powered and all LEDs illuminate on SACM 3 Press the TEST button on the SACM 4 Verify that all of the connected loads to be shed become disabled 5 Af...

Страница 23: ...Drawings and Diagrams Automatic Transfer Switch Owner s Manual 19 Section 5 Drawings and Diagrams Installation Drawings No 0G6832 A 100A SE non SE 150 200A non SE...

Страница 24: ...Drawings and Diagrams 20 Automatic Transfer Switch Owner s Manual No 10000012171 A 150 200A SE...

Страница 25: ...Drawings and Diagrams Automatic Transfer Switch Owner s Manual 21 Interconnection Drawings No 10000009574 Part 1 of 2 Liquid Cooled Generator...

Страница 26: ...Drawings and Diagrams 22 Automatic Transfer Switch Owner s Manual No 10000009574 Part 2 of 2 Liquid Cooled Generator...

Страница 27: ...Drawings and Diagrams Automatic Transfer Switch Owner s Manual 23 No 10000009620 SE and non SE Rated ATS 1 of 2 Air Cooled Generator...

Страница 28: ...Drawings and Diagrams 24 Automatic Transfer Switch Owner s Manual No 10000009620 SE and non SE Rated ATS 2 of 2 Air Cooled Generator...

Страница 29: ...Drawings and Diagrams Automatic Transfer Switch Owner s Manual 25 This page intentionally left blank...

Страница 30: ...Drawings and Diagrams 26 Automatic Transfer Switch Owner s Manual This page intentionally left blank...

Страница 31: ......

Страница 32: ...rights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45 W2929...

Отзывы: