Unpacking and Inspection
8
Installation Guidelines for Air-Cooled Generators
2.3 — Unpacking
1.
Remove shipping carton. See Figure 2-1.
Figure 2-1. Unpack Generator
2.
Remove
four
bolts with crating clamps. Carefully lift the generator off the wooden pallet. Do
NOT
drag the gener-
ator off the pallet or damage to the base will occur. See Figure 2-2.
Figure 2-2. Remove Crating Clamps
Wooden
Generator
Frame
15 kW
Lid
Front
Crating Clamps (4)
Access Panel
Pallet
15 kW
Содержание 6103 EcoGen
Страница 10: ...6 Installation Guidelines for Air Cooled Generators This page intentionally left blank...
Страница 42: ...Operation 38 Installation Guidelines for Air Cooled Generators This page intentionally left blank...
Страница 50: ...Accessories 46 Installation Guidelines for Air Cooled Generators This page intentionally left blank...
Страница 54: ...Installation Diagrams 50 Installation Guidelines for Air Cooled Generators This page intentionally left blank...
Страница 55: ......