4
G E M T E X H E A T I N G S O L U T I O N S L T D
5. Connection Details and Components
The appliance must be installed and maintained by a
qualified certified professional who is approved to install
unvented hot water tanks, according to current statutory
and industry standards in accordance with G3 Building
Regulations.
The tank itself comes ready for electrical and mechanical
connections to the installation. However, the unvented kit
which is supplied in a separate package must be assembled
and connected by the installer.
When required by Building control or local bylaws, a thermostatic
mixer must be placed on the domestic hot water supply system
to limit the temperature at the drawing point (50°C).
Check that the primary circuit pressure (exchanger) does not
exceed 8 bars or the maximum acceptable boiler pressure if
this is less than 8 bars.
When the domestic hot water production system has been
selected to provide its maximum performance, check that
the boiler’s flow rate, primary temperature and power are
respected according to those of the tank exchanger.
NOTE TO INSTALLER:
Please read this manual fully prior to commencing installation.
Leave the manual with the householder after installation of
the Gemtex hot water tank.
6. Installation Instructions
Содержание GTX 150
Страница 1: ...H E A T I N G S O L U T I O N S L T D GTX manual info gemtex co uk www gemtex co uk 01256 587 800...
Страница 2: ...H E A T I N G S O L U T I O N S L T D...
Страница 5: ...info gemtex co uk www gemtex co uk 3 4 Dimensions...
Страница 19: ...H E A T I N G S O L U T I O N S L T D www gemtex co uk...