BCB US Rev.00 01-2019
pag. 4
5.
INSTALLATION
20
5.1
– Preparation for installation
5.2
– Unpacking
5.2.1
– Means required
5.2.2
– Unpacking procedure
5.3
– Handling the blast chiller
5.3.1
– Means required
5.3.2
– Handling the unpacked blast chiller
5.4
– Blast chiller assembly
6.
SETTING UP
22
6.1
– Connections
6.1.1
– Electrical connection
6.2
– Preliminary checks
6.2.1
– Regulation
7.
USE
23
7.1
– Reccomended use
7.2
– Non recommended use
7.3
– Control panel
7.4
– Control procedures
7.5
– Product recommended use
7.6
–
Soft chilling
7.6.1
– Setting and Selecting of soft chilling cycle (Soft blast chilling)
7.7
–
Hard chilling
7.7.1
– Setting and Selecting of hard chilling cycle (Hard blast chilling)
7.8
–
Freezing
7.8.1
– Setting and Selecting a of freezing cycle
7.9
– Special functions and uses
7.9.1
– Pre-chilling function
7.9.2
– Defrost
7.9.3
– Long idle perdios
Содержание New Runner BCB/05US
Страница 2: ...BCB US Rev 00 01 2019 pag 2 Serial Number...
Страница 12: ...BCB US Rev 00 01 2019 pag 12 2 2 DECLARATION OF CONFORMITY...
Страница 24: ...BCB US Rev 00 01 2019 pag 24 7 3 CONTROL PANEL or Fig 7...
Страница 39: ...BCB US Rev 00 01 2019 pag 39...
Страница 40: ...BCB US Rev 00 01 2019 pag 40...
Страница 41: ...BCB US Rev 00 01 2019 pag 41...
Страница 42: ...BCB US Rev 00 01 2019 pag 42 NOTE...
Страница 43: ......