![geminox THR 10-100 C Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/geminox/thr-10-100-c/thr-10-100-c_technical-instructions_2207806003.webp)
&217(17
4.1 - Safety valve ............................................................................................................................. 28
4.2 - Expansion tank on the domestic water primary circuit (THR 10-100 CS only) ........................ 28
4.3 - The expansion tank of the heating network ............................................................................. 29
4.4 - Connection options of a THR 10-100 ..................................................................................... 29
4.5 - Liquid waste evacuation .......................................................................................................... 30
6.1 - Connection to the network ....................................................................................................... 33
6.2 - Connection of pumps and sensors .......................................................................................... 33
6.3 - Skeleton diagram ..................................................................................................................... 34
6.4 - Wiring diagram ........................................................................................................................ 36
6.5 - Wiring diagram RVA box (Cascade and heating circuit management) ................................... 37
1.1 - Hydraulic connection ............................................................................................................... 38
1.2 - Electrical connection ................................................................................................................ 39
- DOMESTIC HOT WATER PRODUCTION BY THE LOAD PUMP (VIA THE RVA 47) ....................... 40
2.1 - Hydraulic connection ............................................................................................................... 40
2.2 - Electrical connection ................................................................................................................ 41
2.3 - D.h.w. priority ........................................................................................................................... 42
3.1 - Hydraulic connection ............................................................................................................... 44
3.2 - Electrical connection ................................................................................................................ 44
3.3 - D.h.w. production with a selector valve (via an LGM)
3.4 - D.h.w. production with a selector valve (via two LGMs)
3.5 - D.h.w. production with a selector valve (via two LGMs)
- FROST PROTECTION AND ANTI-CORROSION FOR THE INSTALLATION.................................... 48