We reserve the right to modify the characteristics of the equipment supplied without notice or as part of the continued development of our products. 

 
 

              3 

EBS WRc APPROVAL AMENDMENT TO MANUAL 

 

WRc Approval No : 0210132 

 

**NOTE TO INSTALLER** : 
Please read fully prior to commencing installation.  Leave manual with householder after 
installation. 
 
1 TECHNICAL 

INFORMATION 

Table 1 

MODEL 

EBS 100 

EBS 150 

EBS 200 

EBS 300 

Operating Pressure 

3.5 Bar 

3.5 Bar 

3.5 Bar 

3.5 Bar 

 

 

 

 

 

Max Water Supply Pressure 

12 Bar 

12 Bar 

12 Bar 

12 Bar 

 

 

 

 

 

Exp Relief Valve Setting 

6 Bar 

6 Bar 

6 Bar 

6 Bar 

 

 

 

 

 

Nominal Storage Capacity 

100 litres 

150 litres 

200 litres 

300 litres 

 

 

 

 

 

Pressure & Temperature Relief Valve 

7 Bar/90 

o

C 7 

Bar/90 

o

C 7 

Bar/90 

o

C 7 

Bar/90 

o

 

 

 

 

 

Expansion Vessel Charge Pressure 

3.5 Bar 

3.5 Bar 

3.5 Bar 

3.5 Bar 

 

 

 

 

 

Weight without water 

35 kg 

45 kg 

55 kg 

70 kg 

 

 

 

 

 

CONNECTIONS 

 

 

 

 

Cold Water Inlet 

¾” 

¾” 

¾” 

¾” 

 

 

 

 

 

Domestic Hot Water Flow 

¾” 

¾” 

¾” 

¾” 

 

 

 

 

 

Hot Water Secondary Returns 

¾” 

¾” 

¾” 

¾” 

 

 

 

 

 

Primary Flow from Boiler 

¾” 

¾” 

¾” 

¾” 

 

 

 

 

 

Primary Return to Boiler 

¾” 

¾” 

¾” 

¾” 

 

2 MAINTENANCE 

 

WARNING : 

BEFORE COMMENCING ANY MAINTENANCE WORK, ISOLATE ALL MAINS 
ELECTRICITY SUPPLIES TO THE SYSTEM 

 

The Cylinder and Cold Water Supply Kit should be inspected annually. 
 

  Close mains supply cock. 

  Drain down hot water system including the cylinder. (Use drain cock and/or the expansion relief 

valve). 

  Check pressure in expansion vessel(s) and recharge to 3.5 Bar, if necessary. 

  Remove filter in line strainer.  Clean or replace.  Re-assemble.  Refill system. 

  Check all pipework for leaks. 

  Open P & T valve and check that it discharges water. 

  Open expansion relief valve and check that it discharges water. 

  Check operation of all controls. 

 
Every two years, the following additional maintenance should also be carried out after draining 
down. 
 

 

Remove Electric Immersion Heater cover (if fitted). 

 

Disconnect wiring to Immersion Heater Boss (if fitted). 

Содержание EBS 100

Страница 1: ...We reserve the right to modify the characteristics of the equipment supplied without notice or as part of the continued development of our products 0...

Страница 2: ...100 313 531 THI 0 9 9 C BS 300 9 1 4 4 37 7 86 153 476 693 THI 2 13 C BS 100 13 5 6 5 15 2 19 35 160 483 THI 2 13 C BS 150 13 5 6 5 21 3 29 52 241 564 THI 2 13 C BS 200 13 5 6 5 26 7 38 68 313 636 TH...

Страница 3: ...ex Page 2 Index 3 WRc approved documentation Contains important information please read 6 Important notice please read 7 Hydraulic connections for cylinders 9 Cylinders with immersion heaters 11 Cylin...

Страница 4: ...ater 35 kg 45 kg 55 kg 70 kg CONNECTIONS Cold Water Inlet Domestic Hot Water Flow Hot Water Secondary Returns Primary Flow from Boiler Primary Return to Boiler 2 MAINTENANCE WARNING BEFORE COMMENCING...

Страница 5: ...it should be carried into position within its packaging and on its pallet Once in position the pallet should be removed The cylinder should be installed on a floor designed to take the weight of the c...

Страница 6: ...s both hot and cold water and any other water discharge points showers etc Check operation of expansion relief valve on Cold Water Supply Kit by lifting manual release lever and discharging water Chec...

Страница 7: ...See Table 2 below for sizing details of safety discharge pipe from our tundish Table 2 Sizing of copper discharge pipe D2 for common temperature relief valve outlet sizes Valve Outlet Size Minimum Si...

Страница 8: ...t on the cold water supply The Unvented kit contains pressure reducing valve non return valve pressure relief valve and optional use balanced cold water connector It is good practice to fit the unvent...

Страница 9: ...right to modify the characteristics of the equipment supplied without notice or as part of the continued development of our products 8 Fig 3 1 Unvented kit for EBS cylinders Fig 4 1 Unvented kit for...

Страница 10: ...without notice or as part of the continued development of our products 10 11 Whilst in heating cycle using the immersion heater the Green selector switch LED will illuminate and extinguish once desir...

Страница 11: ...low CPC 7 The desired temperature setting should now be set using the controls on the top of the cylinder or should be left on maximum if the hot water is controlled via our boiler controls Technical...

Страница 12: ...We reserve the right to modify the characteristics of the equipment supplied without notice or as part of the continued development of our products 13 PRESSURE TEMPERATURE RELIEF VALVE...

Страница 13: ...tics of the equipment supplied without notice as part of our continued development of products IMPORTANT This drawing to be read in conjunction with the full installation manuals supplied SECONDARY RE...

Страница 14: ...We reserve the right to modify the characteristics of the equipment supplied without notice or as part of the continued development of our products 15...

Страница 15: ...We reserve the right to modify the characteristics of the equipment supplied without notice or as part of the continued development of our products 16...

Страница 16: ...ND BUILDING CONTROL INSPECTOR PRIOR TO INSTALLATION 300 mm minimum from Tundish to Bend Building Regulations requirements 200 mm minimum height above HepvO Valve 300 mm between pipe clips PIPE CLIP TO...