
- 18 -
INSTALLATION
1
2
3
4
5
6
7
8
9
EBS-17-3E
300 mm
minim
u
m
fr
om
tundish to bend (Building
R
e
g
u
la
tions requirements)
300 mm be
tween pipe c
lips
20
0
mm mini
mum
hei
g
h
t above HepvO V
a
lve
Fig. 8
This drawing has to be read in conjunction
with the full installation manuals supplied
!
Note :
- This detail is only to be used where there is no other alternative. It is strictly subject to local.
Dispensation and approval must be sought from NHBC and Building Control inspector prior to
installation.
1) 22 mm copper discharge pipe
2) Tundish - visible point off discharge
3) 28 mm copper discharge pipe
4) 32 mm HepvO valve
5) HepvO valve must be vertical and adjacent to the
water unit, to be visible & easily accessible.
6) 32 mm poplypropylene waste pipe
7) Pipe clip to be positioned close to valve to
provide additional support
8) Waste typically discharged to soil stack through
boss adapter
9) Soil stack
Содержание EBS-1 100
Страница 26: ...26 VII PARTS LIST EBS 1 100 150 200 300...
Страница 30: ...30 NOTES...
Страница 31: ...31 NOTES...