
Rev. 00 02/21
16
Product description
OptiCenter OC09
For a better understanding of the interrelationships in powder coating, it is
recommended that the operating instructions for all other components be
read as well, so as to be familiar with their functions too.
Field of application
The powder management center is suitable for use in plants with a closed
powder circuit:
Conveying
–
Precision conveying from the integrated powder container
(OptiHopper) to the applicators
–
Recovered powder is returned to the system
Optional:
–
Fresh powder directly from the (original) powder bag
–
Fresh powder directly from the (original) powder box
–
Powder directly from the large-volume powder container (60 or 100
liters)
–
Fresh powder from a Gema fresh powder system
–
Powder level monitoring by level sensor(s)
Cleaning
–
Automatic internal cleaning of suction tubes, powder conveyors,
powder hoses and guns
–
Manual cleaning of the OptiHopper is supported with automated
cleaning steps and fixed built-in suction unit
–
Supply of the recovered powder
–
The working environment remains clean
Controlling
–
No own exhaust air system
– the powder management center does
not have its own exhaust air system and will be therefore connected
directly to the after filter
Reasonably foreseeable misuse
–
Operation without the proper training
–
Use of moist powder
–
Insufficient fluidization at the suction point
–
Use with insufficient compressed air quality
–
Input pressure too low
–
Use in connection with unauthorized coating devices or components
Содержание OptiCenter OC09
Страница 10: ...Rev 00 02 21 10 About these instructions OptiCenter OC09 ...
Страница 52: ...Rev 00 02 21 52 Touch panel operating panel OptiCenter OC09 ...
Страница 80: ...Rev 00 02 21 80 Maintenance Repairs OptiCenter OC09 ...
Страница 84: ...Rev 00 02 21 84 Fault clearance OptiCenter OC09 ...
Страница 88: ...Rev 00 02 21 88 Decommissioning Storage OptiCenter OC09 ...
Страница 112: ...Rev 00 ...