Rev. 00 03/22
OptiFeed BigBag (FPS16)
Start-up
•
27
Pneumatic connection
The compressed air must be connected to the control unit input in
accordance to the specifications. All compressed air consumers will be
supplied by the control unit.
Fig. 7:
Description
1
Lift/lower
2
Fluid air
P min = 0.5 bar
3
Compressed air supply of pinch valves (FPS16-2 version
only)
P max. = 3.0 bar
Powder connections
The powder hose must be connected according to the corresponding
powder pump(s).
Содержание FPS16
Страница 6: ......
Страница 34: ...Rev 00 03 22 34 Start up OptiFeed BigBag FPS16 ...
Страница 38: ...Rev 00 03 22 38 Operation OptiFeed BigBag FPS16 ...
Страница 52: ...Rev 00 03 22 52 Fault clearance OptiFeed BigBag FPS16 ...
Страница 54: ...Rev 00 03 22 54 Disposal OptiFeed BigBag FPS16 ...
Страница 60: ......
Страница 62: ...Rev 00 ...