background image

www.gemu-group.com

5 / 24

GEMÜ 225

2 Safety information

The safety information in this document refers only to an in-
dividual product. Potentially dangerous conditions can arise
in combination with other plant components, which need to
be considered on the basis of a risk analysis. The operator is
responsible for the production of the risk analysis and for
compliance with the resulting precautionary measures and
regional safety regulations.

The document contains fundamental safety information that
must be observed during commissioning, operation and
maintenance. Non-compliance with these instructions may
cause:

Personal hazard due to electrical, mechanical and chemical
effects.

Hazard to nearby equipment.

Failure of important functions.

Hazard to the environment due to the leakage of dangerous
materials.

The safety information does not take into account:

Unexpected incidents and events, which may occur during
installation, operation and maintenance.

Local safety regulations which must be adhered to by the
operator and by any additional installation personnel.

Prior to commissioning:

1. Transport and store the product correctly.

2. Do not paint the bolts and plastic parts of the product.

3. Carry out installation and commissioning using trained

personnel.

4. Provide adequate training for installation and operating

personnel.

5. Ensure that the contents of the document have been fully

understood by the responsible personnel.

6. Define the areas of responsibility.

7. Observe the safety data sheets.

8. Observe the safety regulations for the media used.

During operation:

9. Keep this document available at the place of use.

10. Observe the safety information.

11. Operate the product in accordance with this document.

12. Operate the product in accordance with the specifica-

tions.

13. Maintain the product correctly.

14. Do not carry out any maintenance work and repairs not

described in this document without consulting the manu-
facturer first.

In cases of uncertainty:

15. Consult the nearest GEMÜ sales office.

3 Product description

3.1 Construction

4

5

1

2

3

Item

Name

Materials

1

Plug

PA

2

Optical position
indicator

PVC

3

Manual override PBT

4

Valve housing

PBT

5

Valve body

PVC-U, grey

Seal materials

FPM or EPDM

3.2 Description

The GEMÜ 225 servo assisted 2/2-way plastic solenoid valve
has a high performance coil. The armature is sealed by a bel-
lows made of PTFE backed by an additional safety dia-
phragm. The plug has a rectifier for use with an AC supply. A
manual override and an optical position indicator are integ-
rated as standard.

3.3 Function

The GEMÜ 225 2/2-way servo assisted solenoid valve has a
plastic valve body. The flow direction is fixed and indicated
by an arrow on the valve body. A minimum pressure differen-
tial is required for the operation of the solenoid valve.

3 Product description

Содержание 225 DN 10

Страница 1: ...GEM 225 Electrically operated solenoid valve Operating instructions EN further information webcode GW 225...

Страница 2: ...rights including copyrights or industrial property rights are expressly reserved Keep the document for future reference GEM Gebr M ller Apparatebau GmbH Co KG 18 02 2021 www gemu group com 2 24 GEM 2...

Страница 3: ...iping 12 9 1 Installation with solvent cement sockets 12 9 2 Installation with solvent cement spigots 12 9 3 Installation with threaded sockets 12 9 4 Installation with union ends 12 10 Electrical con...

Страница 4: ...um The medium that flows through the GEM product 1 4 Warning notes Wherever possible warning notes are organised according to the following scheme SIGNAL WORD Type and source of the danger Possible sy...

Страница 5: ...on and operating personnel 5 Ensure that the contents of the document have been fully understood by the responsible personnel 6 Define the areas of responsibility 7 Observe the safety data sheets 8 Ob...

Страница 6: ...chamber through the pilot seat than can flow in through the control aperture The differential pressure produced lifts the diaphragm thus opening the main valve seat 2 4 Correct use DANGER Danger of e...

Страница 7: ...Spigot inch 30 5 Valve body material Code PVC U grey 1 6 Seal material Code FPM 4 EPDM 14 7 Control function Code Normally closed NC 1 8 Voltage Code 24 V 24 120 V 120 230 V 230 9 Frequency Code DC D...

Страница 8: ...tandards used EN 55011 1991 150 kHz to 30 MHz EN 55014 1993 148 5 kHz to 30 MHz 6 4 Mechanical data Protection class IP 65 Weight DN 10 DN 15 DN 20 DN 25 DN 32 DN 40 DN 50 0 85 0 9 0 9 2 8 2 8 3 6 3 6...

Страница 9: ...8 W Permissible voltage toler ance 10 to VDE 0580 Duty cycle Continuous duty Wiring note Special wiring on request When using electronic switches and additional wiring carefully design out any potenti...

Страница 10: ...8 88 110 110 Dimensions in inch 7 2 Body dimensions 7 2 1 Solvent cement spigot code 0 30 H1 H L C d Connection Code1 DN 20 DN 25 DN 32 DN 40 DN 50 C 19 22 26 31 39 d 0 25 32 40 50 63 30 26 7 33 4 H 5...

Страница 11: ...1 1 4 H 63 63 H1 30 30 D 43 53 LA 108 108 LB 146 152 Dimensions in inch 7 3 Mounting dimensions G E DN 15 DN 20 DN 25 DN 32 DN 40 DN 50 E 40 40 44 5 44 5 44 5 44 5 G M5 M5 M8 M8 M8 M8 10 32 UNF 10 32...

Страница 12: ...e body Only install the solenoid valve in aligned pipes in order to avoid stresses in the valve body Do not exceed the permissible operating pressure Do not exceed the permissible temperature of the w...

Страница 13: ...afe extra low voltage Electric shock can cause severe burns and fatal injury Work on electrical connections only by qualified trained personnel Disconnect the cable from the power supply before making...

Страница 14: ...TICE Operating pressure too high The valve cannot be opened electromagnetically if the operating pressure is too high CAUTION Foreign matter Damage to the valves If the plant is new and after repairs...

Страница 15: ...e parts Damage to the GEM product Manufacturer liability and guarantee will be void Use only genuine parts from GEM CAUTION Hot plant components Risk of burns Only work on plant that has cooled down N...

Страница 16: ...with the valves fully open The plant operator is responsible for selecting the clean ing material and performing the procedure Clean the product with a damp cloth Do not clean the product with a high...

Страница 17: ...nnected Check connection of plug and correct if necessary Operating pressure too high Check operating pressure reduce if ne cessary PTFE bush leaking Replace solenoid valve Armature blocked Replace so...

Страница 18: ...and gas diffu sion from penetrated media 2 Dispose of all parts in accordance with the disposal regu lations environmental protection laws 17 Returns Legal regulations for the protection of the envir...

Страница 19: ...iled in accordance with part B of Annex VII The manufacturer or his authorised representative undertake to transmit in response to a reasoned request by the national authorities relevant information o...

Страница 20: ...land Industrie Service GmbH Number 0035 Certificate no 01 202 926 Q 02 0036 Conformity assessment procedure Module H Technical standard used EN 1983 AD 2000 Note for products with a nominal size DN 25...

Страница 21: ...www gemu group com 21 24 GEM 225...

Страница 22: ...www gemu group com 22 24 GEM 225...

Страница 23: ...www gemu group com 23 24 GEM 225...

Страница 24: ...EM Gebr M ller Apparatebau GmbH Co KG Fritz M ller Stra e 6 8 74653 Ingelfingen Criesbach Ger many Phone 49 0 7940 1230 info gemue de www gemu group com Subject to alteration 02 2021 88593469 88593469...

Отзывы: