
USER INSTRUCTIONS GH11RA
STRONA
18
Wydanie I
STYCZEŃ 2010
STEP 3
Remove a top part of casing
(lever snap fasteners)
by using of flat screwdriver
STEP 4
Remove connectors
(with connected wires) from plugs,
unscrew ground wires from PE strip,
loosen strip which is tightening wires and
take all wires out of the controller
STEP 5
Dismount a controller
from boiler by unscrewing
four screws in the bottom part
of the casing of the controller
STEP 6
Install top part of the casing
and front panel