background image

11 

3.3. Cable mounting 
 

For the choice of cable, chart 1 must be consulted. 
The cable must run-off upwards from behind the drum. 
The cable is allowed to run-off backwards horizontally from underneath the drum with the WW series as well as 
with some of the models in the VL series. 

 
Be careful! 
The brake does not work in the case of an incorrect cable run-
off. 

 
The cable length must be of sufficient length to allow for 3 
windings to remain on the drum when in the lowest position. 
 
The cable is mounted by means of the fixed cable clamp. 
 
 

 

 
 
 

3.4. Before use 

 
The winch is fitted  with a worm wheel gearing. To ensure a long lifespan we 
recommend that the winch be run in before use. 
Allow the winch to make approx. 5 drum rotations whilst loaded with approx. 50% 
of the nominal load. Remove the protection cover and using a brush, redistribute 
the grease over the worm wheel and the worm gear. Replace the protection 
cover. The winch is now ready for use. 
 

Check before each use if the transfer is sufficiently greased. This will 
prevent "galling" and overheating. 

 
 
To enable the load pressure brake to function correctly, the winch must carry a 
minimum load of approx. 5% of the nominal load. 

 

 
 
 
 

 
3.5. Operating  

 
The winches are suitable for manual operation only. 
For the load to be hoisted, turn the crank clockwise. 
For the load to be lowered, turn the crank anticlockwise.

 

 

 

 
 
 
4. Maintenance 
 
The winch must be unloaded for inspection and maintenance tasks. 
Inspection and maintenance tasks must be performed by skilled personnel, e.g. via your Gebuwin 
dealer. 
 
 

Содержание WW1500 D/MR

Страница 1: ...uden Subject to alterations nderungen vorbehalten Gebruiksaanwijzing Pagina 2 Operating instructions Page 8 Betriebsanleitung Seite 14 Wormwiellieren Wormgear winches Schneckenradwinden WW1500 D MR WW...

Страница 2: ...1...

Страница 3: ...in een omgeving waarin gewerkt wordt met agressieve en of explosiegevaarlijke stoffen Technische veranderingen aan de lieren en of het monteren van randapparaten zijn alleen geoorloofd na schriftelijk...

Страница 4: ...onder last op de eerste laag van de trommel blijven de bovenkant van de laatste kabellaag dient 11 2 x de kabeldiameter vrij te zijn van de uiterste rand van de trommelflens de kabel dient onder voor...

Страница 5: ...5 3 1801 7 68 7 1667 8 3 1 Functie omschrijving De lieren zijn trommellieren met een wormwieloverbrenging De last wordt in elke laag door een ingebouwde lastdrukrem vastgehouden De wormas en kabeltrom...

Страница 6: ...lle trommelomwentelingen maken Verwijder de beschermkap en verdeel het vet met een kwast opnieuw over het wormwiel en de worm Monteer de afschermkap weer De lier is nu klaar voor gebruik Controleer vo...

Страница 7: ...opbouw krom getrokken vet aanbrengen schoonmaken met een oplosmiddel en opnieuw vet aanbrengen bevestigingsvlak vlakken en lier opnieuw monteren De last wordt niet vastgehouden de kabel is verkeerd op...

Страница 8: ...is afgestemd in geval van niet juist of incorrect gebruik van de lier en het niet uit voeren van de vereiste controles Product Lier Type WW1500 D MR WW3000 D MR WW5000 D MR Productienummer Vanaf prod...

Страница 9: ...suitable for mechanized drive continuous use use in an area in which aggressive and or explosive substances are used Technical alterations and or the attachment of marginal devices to the winches are...

Страница 10: ...fety windings on the first layer of the drum when loaded the top of the last cable layer must have 11 2 x the cable diameter clearance between the outer edge of the drum flange the cable must be prest...

Страница 11: ...7 42 9 3276 6 41 3 846 55 3 1801 7 68 7 1667 8 3 1 Function description The winches are drum winches with a worm gearing The load is held at each required height by a built in load pressure brake The...

Страница 12: ...efore use Allow the winch to make approx 5 drum rotations whilst loaded with approx 50 of the nominal load Remove the protection cover and using a brush redistribute the grease over the worm wheel and...

Страница 13: ...ng the winch has pulled askew apply grease clean with a detergent and re grease level the mounting surface and re mount the winch The load cannot be held the cable has been incorrectly wound round the...

Страница 14: ...declaration will cease in case that the machine will not be operated correctly and in accordance to the operating instructions and or not be inspected regularly Product Hand Rope Winch Type WW1500 D...

Страница 15: ...ebung in der mit aggressiven bzw explosionsgef hrlichen Stoffen gearbeitet wird Technische Ver nderungen an den Winden bzw das Montieren von Randapparaturen sind nur nach vorheriger schriftlicher Zust...

Страница 16: ...n unter Last auf der ersten Lage auf der Trommel bleiben die Oberseite der letzten Seillage muss frei liegen vom u ersten Rand der Trommelflansch und zwar muss der Abstand das 11 2 fache des Seildurch...

Страница 17: ...reibung Es handelt sich bei den Winden um Trommelwinden mit einem Schneckenwellenantrieb Die Last wird in jeder Lage von einer eingebauten Lastdruckbremse festgehalten Die Schneckenwelle und die Seilt...

Страница 18: ...hen Um eine lange Lebensdauer zu garantieren raten wir Ihnen die Winde einlaufen zu lassen Machen Sie mit der Winde mit ca 50 der Nominallast ca 5 ganze Trommelumdrehungen Entfernen Sie die Schutzkapp...

Страница 19: ...rungen St rungen Ursache Beheben Die Winde l sst sich in unbelastetem Zustand nur schwer drehen kein Fett auf der berbringung Schmutz in der berbringung Winde wurde beim Aufbau schief gezogen Fett an...

Страница 20: ...f gung stattgefunden hat die nicht mit uns abgestimmt wurde Im Falle des unsachgem en oder unkorrekten Betriebes der Winde und wenn die erforderlichen Kontrollen nicht ausgef hrt wurden Produkt Handse...

Страница 21: ...20 WW1500 D MR...

Страница 22: ...21 WW3000 5000 D MR...

Отзывы: