16
D
GB
F
E
96460-12.2020-DGb
5.3
Basic circuit diagram for part winding start
* With several connect them in series
Fig. 14
Οnderung
2
0
Datum
Name
Datum
Bearb.
Gepr.
Norm
1
20.02.2009
bauknecht
26.11.2020
Urspr.
2
Ers. f.
3
Ers. d.
4
PW INT69 HG44/66
5
6
7
BOCK COMPRESSORS
8
=
+
9
Bl.
6.d
Bl.
5.a
2.a
Anschlußkasten Verdichter
BT1
INT69
DELTA- P II
QA1
L1
L2
L3 N PE
FC1.1
I>
I>
I>
QA2
1U1
1V1
1W1
PE
EC1
M
Y/YY
2U1
2V1
2W1
FC1.2
I>
I>
I>
QA3
FC1.1
FC1.2
FC2
SF1
BP2
P>
QA2
BP3
P
QA2
KF1
KF1
2.8
5.a.8
QA2
L1.1
L2.1
L3.1
L1.2
N
PE
QA3
BT4
BT2
Θ
11
12
14
L
N B1 B2
12
11
10
9
8
7
6
5
4
3
2
1
Θ
vio
bn
bu
gr
Θ
EB1
pk
og
21
20
BT3
Θ
50%
50%
Compressor terminal box
BP2
High pressure safety monitor
BP3
Safety chain (high/low pressure monitoring)
BT1
Cold conductor (PTC sensor) motor winding
BT2
Thermal protection thermostat*
BT3
Oil temperature sensor
BT4
Release switch (thermostat)
DELTA-P II Oil differential pressure sensor DELTA-P II (accessory)
EB1
Oil sump heater
EC1
Compressor motor