
9
Installation Preparation
Vent Mode
,QYHQWPRGHLQVWDOODWLRQFDQEHGRQHZLWKRUZLWK
-
RXWWKHULVHU<RXPXVWFRQVLGHUµULVHUKHLJKWLQ
GHWHUPLQLQJWKHKRRGLQVWDOODWLRQKHLJKW
7RGHWHUPLQHWKHKRRGLQVWDOODWLRQKHLJKWZLWKULVHU
; &$%5<=
([DPSOH; µµµµµµ
; µ
7RGHWHUPLQHWKHKRRGLQVWDOODWLRQKHLJKWZLWKRXW
ULVHU
; &$%<=
([DPSOH; µµµµµ
; µ
NOTE:
Installation height should be measured from
the cooking surface to the bottom of the hood. The
vent hood must be installed 24” min. and 36” max.
above the cooking surface. The hood installation
height, from the cooking surface to the bottom of the
hood, depends upon ceiling height and other factors
which must be considered .
Z
Y
B=10 1/2”
C=Ceiling
Height
A
X=24” Min, 36” Max
R=3 1/2” (Optional)
Y
Z=0
B=10 1/2”
C=Ceiling
Height
A
X=24” Min, 36” Max
Содержание ZV30H Series
Страница 19: ...Notes 19...