background image

ZNET901A
Modbus Annunciator

M

1

Single Phase Amp Meter (Analog)

M

2

Three Phase Amp Meter (Analog)

M

90

EPM

22

00 True RMS Digital Meter with display (Amps, Volts, Power,

 

Energy, Power Factory and Frequency). 3 Line LED Display. 50/60 Hz

 

Universal Operation. 1 or 3 phase. Standard Modbus RTU RS485

 

communications capability. 40 - 1200 Amps.

M

90A

Adds Pre-Wiring for Enervista Viewpoint Monitoring of M90

 

Accessory & ATS Status using Modbus RS485 Serial Communications 

M

90B

Adds Pre-Wiring for Enervista Viewpoint Monitoring of M90

 

Accessory & ATS Status using Ethernet TCP/IP Communications 

M

91

EPM6000 True RMS Digital Meter with display (Amps, Volts,

 

Power, Energy, Power Factory and Frequency, THD). Certified

 

energy and demand metering. Meets ANSI C12.20 and IEC 687

 

Accuracy Classes. Front IrDA Port Laptop Connection. Standard

 

Modbus RTU RS485 or DNP 3.0 communications capability.

 

M

91A

Adds Pre-Wiring for Enervista Viewpoint Monitoring of M91

 

Accessory & ATS Status using Modbus RS485 Serial Communications  

M

91B

Adds Pre-Wiring for Enervista Viewpoint Monitoring of M91

 

Accessory & ATS Status using Ethernet TCP/IP Communications 

MCM

Modbus RTU

 

Communication Module

N

1

Running Time Indicator - Door mounted

N

2

Operation Counter - Door Mounted

P

1

Engine Start Timer (adjustable to 6 sec.)

P

2

Engine Start Timer (adjustable to 300 sec.)

Q

2

Peak shave/remote load test/area protection -  

Input Relay

(Need to specify voltage - 120 VAC, 24 VAC, 24 VDC - 120V

 

default standard)

Q

3

Inhibit transfer to emergency (Source 2) 

Load add Input Relay

 

(Need to specify voltage - 120 VAC, 24 VAC, 24 VDC -

 

120V 

default standard)

Q

7

Inhibit transfer to normal (Source 1) -

 Input Relay 

(Need to

 

specify voltage - 120 VAC, 24 VAC, 24 VDC - 120V default standard)

 

R

1-1/R1-3

Over Voltage sensing for normal (Source 1) single (R1-1) or 
three

 

(R1-3) phase

R

15/R15D

Load Shed. Should Source 2 become overloaded, an external 
signal can be given to ATS to transfer to the Neutral or dead 
Normal (Source 1) position.

R

16

Phase rotation sensing of Normal (Source 1) and Emergency (Source 2)

R

50

In Phase monitor between Normal (Source 1) and Emergency

(Source 2) to allow transfer

S

5P

Microprocessor 

programmable

 auto/manual retransfer 

selection

 

for transferring to Normal (Source 1) (includes 

controller softkey 

for

 YN accessory)

S

12P

Microprocessor 

programmable

 auto/manual 

transfer selection

 

for 

transferring to Normal (Source 1)

 and Emergency (Source 2)

 

(includes 

controller softkey for

 YN & YE accessory)

S

13P

Microprocessor activated commit/no commit on transferring to

 

Emergency (Source 2) (with enable/disable settings)

S

14

Keyed selector switch for retransfer to normal-test-auto

SW

1

Auto/Off/Start Engine control selector - Door mounted 

(keyed or non-keyed operation available)

SW

2

Auto/Off  Engine control selector - Door mounted 

(keyed or non-keyed operation available)

SW

3

Source Priority Selector Switch - Door mounted

Allows selection of Source 1 or Source 2 to be the Prime Source.

 

Transfer Switch will transfer to selected Prime Source if that

 

Source is available. (keyed or non-keyed operation available)

T

Retransfer to Normal (Source 1) adjustable time delay

T

3/W3

Pre-signal contact on transfer to Normal (Source 1) or

 

Emergency (Source 2) during test

U

Engine stop /cool adjustable cool down timer

UMD

/A62

Pre and post transfer output adjustable time range. Functions in

 

both directions. Includes 2 circuits. (Additional circuits available).

 

VI

Voltage imbalance between phases (3 Phase only)

W

Adjustable time delay on transfer to Emergency (Source 2)

 

YEN

/

YER

Bypass transfer timers function (soft key switch in microprocessor)

Z

enith

ZTS

Series Accessory De

nitions 

(cont.)

PB

-5066

Page 6

Содержание Zenith ZTS Series

Страница 1: ...GE Digital Energy Power Quality Zenith ZTS Series Low Voltage Automatic and Manual Transfer Switches ...

Страница 2: ...ed Transition Bypass Switches 100 4000 Amps All ZTS products meet or exceed industry requirements allowing specification and installation confidence UL 1008 listed through 480 VAC CSA C22 2 No 178 listed through 600 VAC IEC 947 6 1 listed through 480 VAC Codes and Standards NFPA 70 99 101 110 IEEE 446 241 602 NEC 517 700 701 702 NEMA ICS 10 Controls tested in accordance with IEEE 472 ANSI C37 90A EN...

Страница 3: ...ounted on a specially formed panel Logic devices including microprocessor control auxiliary time delays and special accessory equipment are assembled on the door for ease of maintenance and separation from the power section They are connected with a numbered wiring harness equipped with a disconnect plug that allows isolation of the control panel for maintenance ZTS Series Method of Operation When...

Страница 4: ...ommunications allowing connectivity with other ATS s paralleling switchgear and SCADA systems Time tested synchronous logic automatically measures phase angle and frequency allowing disturbance free transfer Unsurpassed statistical ATS System monitoring available in real time T3 W3 elevator pre signal Automatically bypassed if the selected source fails minimizing time an elevator is without power ...

Страница 5: ...es and need to be specified AB3 Auxiliary Contact closed in bypass emergency Source 2 S P D T Standard up to 400A Additional available 10 max on ZBTS Series and need to be specified AB4 Auxiliary Contact closed in bypass normal Source 1 S P D T Standard up to 400A Additional available 10 max on ZBTS Series and need to be specified CALIBRATE Microprocessor activated calibration feature CDP Programm...

Страница 6: ... 1 R1 3 Over Voltage sensing for normal Source 1 single R1 1 or three R1 3 phase R15 R15D Load Shed Should Source 2 become overloaded an external signal can be given to ATS to transfer to the Neutral or dead Normal Source 1 position R16 Phase rotation sensing of Normal Source 1 and Emergency Source 2 R50 In Phase monitor between Normal Source 1 and Emergency Source 2 to allow transfer S5P Micropro...

Страница 7: ...14 HxWxD For 260 400A the enclosure is 66 x 24 x 19 75 HxWxD For 600A the enclosure is 74 x 40 x 19 75 HxWxD For certified drawings please contact the GE factory Application Notes NOTES Line and load terminals are located in rear and arranged for bus bar connection Terminal lugs are available as an accessory Contact the GE factory for more details 1 Special terminal lugs and neutral bars are availa...

Страница 8: ...0 1 3 wire 50 5 7 480 1 2 wire 60 5 8 254 440 3 4 wire 60 6 0 575 3 3 wire 60 6 1 347 600 3 4 wire 60 6 3 575 1 2 wire 60 7 0 277 480 3 4 wire 60 7 1 277 1 2 wire 60 7 4 266 460 3 4 wire 60 7 5 460 3 3 wire 60 8 2 380 1 2 wire 50 9 0 240 416 3 4 wire 60 9 1 220 380 3 4 wire 60 9 2 220 380 3 4 wire 50 9 3 240 416 3 4 wire 50 9 7 380 3 3 wire 60 Note Operating voltage must be specified at time of or...