C1 - 01 - Cover Sheet
C2 - 02 - Disclaimer - Site Readiness
A1 - 03 - 

General Notes

A2 - 04 - Equipment Layout
A3 - 05 - Section Views
A4 - 06 - Acoustic - Proximity Limits
A5 - 07 - RF Shielding
A6 - 08 - Equipment Dimensions (1)
A7 - 09 - Equipment Dimensions (2)
A8 - 10 - Delivery
S1 - 11 - Structural Notes
S2 - 12 - Structural Layout

S3 - 13 - Structural Details
M1 - 14 - Mechanical Layout
M2 - 15 - HVAC - Venting
M3 - 16 - Chilled Water
M4 - 17 - Cryogenics (1)
M5 - 18 - Cryogenics (2)
E1 - 19 - Electrical Notes
E2 - 20 - Electrical Layout
E3 - 21 - Electrical Elevation
E4 - 22 - Electrical Details
E5 - 23 - Power Requirements
E6 - 24 - Interconnections

----

----

SIGNA PIONEER

PMM

GE Healthcare

GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete

set  of  final  issue  drawing.  GE  cannot  accept  responsibility  for  any  damage  due  to  the  partial  use  of  GE  final  issue  drawings,  however  caused.  All

dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work

due to scaling from these drawings.

/24

EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG

----

----

PMM

5680003-1EN

----

1/4"=1'-0"

----

23/Jul/2018

Typical

A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in

incomplete documentation required for site design and preparation.

Pre Installation documents for GE Healthcare products can be accessed on the web at: 

www.gehealthcare.com/siteplanning

-

Drawn by

Verified by

PIM Manual

Sheet

Format

Concession

Scale

Date

File Name

Rev

S.O. (GON)

A3

3

REV

DATE

MODIFICATIONS

A

23/Jul/2018

First issue drawing / Final study based on MRI-

FINAL STUDY

01

Содержание SIGNA PIONEER

Страница 1: ... set of final issue drawing GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings however caused All dimensions are in millimeters unless otherwise specified Do not scale from printed pdf files GE accepts no responsibility or liability for defective work due to scaling from these drawings 24 EN MRI TYP SIGNA_PIONEER WEB DWG PMM 5680003 1EN 1 4 1 0 23 Jul ...

Страница 2: ...om if applicable Power for MR compressor Chiller is available Ensure cryogen venting system is available for magnet connection Exhaust fan system is installed and operational per GE requirements Status of work General comments System can be delivered PMI signature Site ready for installation FS signature optional GLOBAL SITE READINESS CHECKLIST DI DOC1809666 Rev 5 GENERAL SPECIFICATIONS GE is not ...

Страница 3: ...contained to the magnet room If not possible a barrier is recommended to prevent entry to the 5g field area 2 The spaces around above and below the magnet must be reviewed for effects of the 5g 3g 1g and 5g fields Refer to the proximity limit chart in the MR pre installation manual referenced on the cover sheet 3 For moving metal the restriction lines typically extend outside of the MR space Pleas...

Страница 4: ...width C 25 Minimum opening for is 43 in w x 82 in h contingent on a 96 in corridor width C 26 Counter top for equipment provide grommeted openings as required to route cables C 27 Base cabinet for storage of surface coils patient positioning pads phantoms etc C 28 Louvered doors refer to preinstall for requirements C 29 Magnet access 9 0 x10 0 C 30 Shelf LEGEND A GE Supplied C Customer contractor ...

Страница 5: ...LD Note Define RF shield s inset according to provisions made by the RF Shield vendor Warning 5 Gauss line outside the Magnet room limits MAGNET ROOM CONTROL ROOM FRONT VIEW WITH MAGNETIC FIELD 4 3 2 1 1 2 9 MAGNET ROOM Note Define RF shield s inset according to provisions made by the RF Shield vendor Warning 5 Gauss line outside the Magnet room limits 8 9 TBD TBD 8 9 TBD TBD 3 6 3 6 8 9 8 9 ...

Страница 6: ...dry equipment Food preparation area Water cooling equipment HVAC equipment Major mechanical equipment room Credit cards watches and clocks Air conditioning equipment Fuel storage tanks Motors greater than 5 horsepower 50 gauss 5mT Metal detector for screening LCD panels Telephones No Limit Digital Detectors Acoustic and vibroacoustic information is provided for site planning and architectural desi...

Страница 7: ...ew INTEGRATED COOLING CABINET Top View PENETRATION PANEL CLOSET An enclosure i e closet must be provided to restrict access to the PEN panels and for storage of excess interconnections The PEN closet must have a mechanical locking mechanism to restrict access to the PEN panels The PEN closet must maintain the minimum service area outside the 200 Gauss in the magnet room PEN closet must allow free ...

Страница 8: ...n 150 5 9 in 1130 44 5 in 860 33 9 in 340 13 4 in 825 32 5 in Service clearance Cable drop area Cover 150 70 0 5 9 in 2 8 in 0 in 300 11 8 in 388 15 3 in 800 31 5 in 907 35 7 in 3674 144 7 in SIDE VIEW TOP VIEW NOT TO SCALE PATIENT TABLE PT Center of gravity MAGNET ENCLOSURE Note Center of gravity is approximate and includes the GE Healthcare supplied VibroAcoustic Dampening Kit but does not inclu...

Страница 9: ...of Gravity SCALE 1 10 TOP VIEW FRONT VIEW SIDE VIEW 194 7 64 in 401 15 79 in 755 29 71 in 308 12 13 in 700 27 56 in 335 5 13 21 in Date Rev 24 EN MRI TYP SIGNA_PIONEER WEB DWG A 23 Jul 2018 SIGNA PIONEER Typical A7 Equipment Details 2 09 ...

Страница 10: ...e allow the equipment to be delivered If the site is not ready GE can delay the delivery time Recommended minimum opening for side wall delivery 2500 98 5in width x 2500 98 5in height PATH WITH 90 DEGREE TURN FRONT VIEW OF MAGNET RIGHT SIDE VIEW OF MAGNET STRAIGHT PATH Rigging wheels required GRADIENT COIL REPLACEMENT The weight bearing structure of the site should support any additional weight of...

Страница 11: ...uld be given to the selection of light fixtures cabinets wall decorations etc To minimize this potential hazard For safety all removable items within the magnet room such as faucet handles drain covers switch box cover plates light fixture components mounting screws etc Must be non magnetic If you have a specific question about material bring it to the attention of your GE project manager of insta...

Страница 12: ...ED INSTALLED 3 Patient table dock anchoring 4 Structural wall backing for Main Disconnect Panel 5 Structural wall backing for Magnet Rundown Unit Date Rev 24 EN MRI TYP SIGNA_PIONEER WEB DWG A 23 Jul 2018 SIGNA PIONEER Typical S2 Structural Layout 12 MAGNET ROOM EQUIPMENT ROOM CONTROL ROOM 4 5 3 1 1 1 1 5 2 17 3 9 4 11 6 6 4 9 4 LOCATED ELSEWHERE ...

Страница 13: ...ement cart throughout operation and service life Floor must be flat and level to 3 mm 0 12in between high and low spots over the area shown 3419mm 134 61in 943mm 37 13in PATIENT TABLE DOCK ANCHOR MOUNTING REQUIREMENTS The RF Shield vendor must design and install the dock anchor bolt The dock anchor hole must be drilled after the Magnet is installed The dock anchor must not contact floor rebar or o...

Страница 14: ...supports hoses clamps ventlation systems etc are to be supplied and installed by the customer or his contractors For complete design and requirements specifications and guidelines refer to the pre installation manual system cooling cryogen venting waveguides and exhaust venting An emergency water cooling back up supply is recommended for continuous cryogen compressor operation if using an open loo...

Страница 15: ...hes in parallel Ductwork Ductwork MAGNET ROOM VENTING REQUIREMENTS HVAC VENT REQUIREMENTS HVAC vendor must comply with Magnet room temperature and humidity specifications and RF shielding specifications RF Shield vendor must install open pipe or honeycomb HVAC waveguides All serviceable parts in the Magnet room e g diffusers must be non magnetic Waveguides must be nonmagnetic and electrically isol...

Страница 16: ... emergency backup facility coolant For the site without insite connection the customer must provide and install an in line thermometer on the supply MAGNET ROOM Integrated System Cabinet ISC EQUIPMENT ROOM CUSTOMER SUPPLIED Water Cooling Water Cooling Return Supply Magnet MAG Gradient Coil VRMw RF Shield Integrated Cooling Cabinet ICC Patient Air Cooling FLOWMETER 100 micron FILTER Facility Plumbi...

Страница 17: ... in KEY COMPONENTS RF waveguide extended from wall to magnet adapter Must be all same material and all welded Support system must withstand 11125 N 2500 lbs GE ventglas must be installed in vertical section directly over magnet TYPICAL CRYOGENIC VENT PIPE DETAIL MAGNET VENT ADAPTER Do not remove or modify the vent adaptor bolted to the magnet VENT PIPE 610 mm 24 in may be cut to a minimum of 100 m...

Страница 18: ...24 39 30 49 0 088 1 991 0 86 5 20 0 57 3 93 1 60 11 06 1 07 7 37 3 21 22 12 14 in 350mm 0 20 0 00 6 10 0 008 0 180 0 123 0 85 0 082 0 57 0 231 1 59 0 154 1 06 0 462 3 18 20 40 6 10 12 22 0 017 0 380 0 206 1 42 0 137 0 95 0 386 2 66 0 257 1 77 0 771 5 32 40 60 12 22 18 29 0 024 0 552 0 281 1 94 0 187 1 29 0 525 3 62 0 350 2 42 1 051 7 25 60 80 18 29 24 39 0 031 0 699 0 349 2 41 0 232 1 60 0 652 4 5...

Страница 19: ...c must run direct as possible otherwise may result in the need for greater than standard cable lengths refer to the interconnection diagram for maximum usable lengths point to point 8 Conduit turns to have large sweeping bends with minimum radius in accordance with national and local electrical codes 9 A special grounding system is required in all procedure rooms by some national and local codes I...

Страница 20: ... SUPPLIED INSTALLED 1 Cable ladder 450mm x 150mm 18 x 6 2 Non ferrous cable ladder 450mm x 150mm 18 x 6 3 Box above ceiling size per local code 4 150mm x 100mm 6 x 3 1 2 Surface wall duct 5 100mm x 100mm x 50mm 4 x 4 x 2 J Box 6 Main disconnect panel 7 One 50mm 2 cnd above ceiling 8 One 75mm 3 cnd above ceiling 9 Breaker Boxes ITEM QTY Outlet Legend for GE Equipment System emergency off SEO recomm...

Страница 21: ...YP SIGNA_PIONEER WEB DWG A 23 Jul 2018 SIGNA PIONEER Typical E3 Electrical Elevations 21 MAGNET ROOM EQUIPMENT ROOM 8 9 TBD TBD 1 MAX 10 8 MIN 0 10 4 4 3 CONTROL ROOM 10 8 MAXIMUM 5 4 5 4 5 5 2 TBD TBD TBD TBD TBD TBD 6 5 5 0 7 ...

Страница 22: ...8 in 6 Minimum distance from top of cable tray to ceiling 254 mm 10 in Minimum distance on either side of an obstruction 254 mm 10 in minimum distance from top of cable tray to Obstruction 178 mm 7 in 9 Minimum distance between trays 12 mm 0 5 in 10 Non ferrous cable support center Cable Tray Requirements Side By Side 1 6 5 10 8 9 11 CABLE TRAYS IN EQUIPMENT ROOM CABLE TRAY DETAIL NOT TO SCALE Min...

Страница 23: ...kVA STAND BY POWER 17kVA SPECIFICATIONS OF MAIN POWER INPUT CABLES Power and cable installation must comply with the distribution diagram Size of the Main power input cable is determined by the customer taking its length and admissible voltage drops into consideration All cables must be isolated and flexible cable color codes must comply with standards for electrical installation The cables from s...

Страница 24: ...NG FOR OPTIONS OPTION FROM TO CABLE LENGTH m ft MRE MRE Magnet Isocenter Nominal 7 31 24 Maximum 10 06 33 MRE ISC cabinet 15 24 50 MRE Ethernet Hub in ISC 15 24 50 MRE Customer Supplied Outlet 60 Hz 6 09 20 50 Hz 7 62 25 9 40 m 30 8 ft 25 00 m 82 ft 5 40 9 40 m 17 5 30 8 ft 24 70 m 81 ft 16 80 m 55 ft 16 40 m 53 8 ft 0 40 6 40 m 1 3 21 ft 13 00 m 42 7 ft 25 00 m 82 ft 24 4m 80 ft 29 8m 97 7 ft Dat...