![GE SE 250 Mighty Small II Скачать руководство пользователя страница 39](http://html.mh-extra.com/html/ge/se-250-mighty-small-ii/se-250-mighty-small-ii_operating-instructions-manual_128044039.webp)
Action
Step
Fill the lower buffer chamber with running buffer.
1
The SE 250/260 Mighty Small II holds about 250 mL. Make sure that the
lower electrode (running along the bottom of the the upper buffer chamber
core) is completely submerged.
Note:
If using precast gels, check that the lower gel/buffer contact surface is exposed
(the colored plastic tape must be removed).
Place the safety lid on the unit.
2
Plug the color-coded leads into the jacks of an approved power supply. The
red lead plugs into the red output jack, and the black lead plugs into the
black output jack.
3
Optional cooling: Begin circulating cold water or a chilled 50/50 water/ethy-
lene glycol solution.
4
SE 250/260 Mighty Small II Operating Instructions 29281629 AA
39
5 Operation
5.2 Assembly