
49-80783
15
2
PREPARING MOUNTING (Cont)
B
To install to the bottom of cabinet
Use the diagram or hood as a template and
mark the locations on the cabinet for the
keyholes screws.
Drive the 4 (F) screws partway into the bottom
of the cabinet (or wood shims).
INST
ALLA
TION PREP
ARA
TION
Installation Preparation
3
PREPARE FOR ELECTRICAL
AND VENTING
Select the vent option that your installation will
require and proceed to that section:
A
Outside top exhaust
(Vertical duct–3
1
»
4
” x 10” Rectangular)
•
Use the diagram as a template and mark the
locations on the cabinet for ductwork and
electrical wiring.
B
Outside top exhaust
(Vertical duct–7” Round)
•
Use the diagram as a template and mark the
locations on the cabinet for ductwork and
electrical wiring.
C
Outside rear exhaust
(Horizontal duct–3
1
»
4
” x 10” Rectangular)
•
Use the diagram as a template and mark the
locations on the cabinet for ductwork and
electrical wiring.
Wood shims
(recessed-bottom
cabinets only)
Center
line
Cabinet Bottom
Cabinet front
2
1
»
2
”
10
1
»
4
”
X
Hood mounting screws (4)
Center line
Electrical access
hole (in cabinet
bottom)
Cabinet front
Cabinet Bottom
Vertical duct
access hole
5
1
»
4
”
5
1
»
4
”
7
1
»
2
”
ø1
1
»
4
”
4”
1
»
2
”
3
»
4
”
Center line
Electrical access
hole (in cabinet
bottom)
Cabinet front
Cabinet Bottom
7
1
»
2
”
ø1
1
»
4
”
3
»
4
”
Access
hole for 7”
round duct
8” DIA.
HOLE
4
1
»
4
”
Center line
Electrical access
hole (in wall)
Cabinet Front
Cabinet
Bottom
7
1
»
2
”
ø1
1
»
4
”
3
»
4
”
5
1
»
4
”
5
1
»
4
”
3
»
4
”
4
1
»
4
”
Cabinet
X
24”
10
3
»
4
”
30”
13
3
»
4
”
36”
16
3
»
4
”
Содержание PVX7360
Страница 22: ...22 49 80783 Notes...
Страница 23: ...49 80783 23 Notes...
Страница 46: ...22 49 80783 Notas...
Страница 47: ...49 80783 23 Notas...