
Installation Preparation
REMOVE THE PACKAGING
CAUTION:
LIFT THE HOOD OUT OF THE BOX
BY THE CENTER METAL PORTION. DO NOT LIFT BY THE
GLASS SIDES.
PRUDENCE :
LEVEZ LA HOTTE À
L’EXTÉRIEUR DE LA BOÎTE PAR LA PORTION MÉTAL
CENTRAL. NE LEVEZ PAS PAR LES CÔTÉS DE VERRE.
CAUTION:
Wear gloves to protect against
sharp edges.
PRUDENCE :
Portez des gants pour éviter
les blessures causées par les tranchants.
•
Grasp the hood by the metal insert in the center
and lift straight up and out of the box.
•
Remove and properly discard the plastic wrapping.
•
Remove parts box, duct covers and other
packaging.
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED
)
Tape measure
Knife
Spirit level
Wire cutter/stripper
Wire nuts
Electric drill with 5/16
″
and 3/8
″
bits
Phillips and flat blade screwdrivers
Hammer
Pliers
Safety glasses
Duct tape
Tape to mount template
Gloves to protect against sharp edges
120V 60Hz. 15 or 20 Amp, 2 wire with
ground Properly grounded branch circuit
Strain relief for junction cover
8
″
round metal duct, length to suit
installation
Saw, jig saw or reciprocating saw
Measuring tape
Electric drill
with 5/16” and
3/8” Bits
12” long
Phillips
head
screwdriver
Safety glasses
Gloves
Spirit level
Knife
Wire
cutter/stripper
Flat blade
screwdriver
Hammer
Pliers
Duct tape
Masking tape
Wire nuts
Strain relief
Saw, jig saw or
reciprocating
saw
6
8
″
round metal duct,
length to suit
installation