
CONNECT DUCTWORK
•
Install ductwork, making connections in the
direction of airflow as illustrated.
•
Push duct over the exhaust outlet and damper.
•
Secure joints in ductwork with sheetmetal screws.
•
Wrap all duct joints and the flange connections
with duct tape for an airtight seal.
CAUTION:
Do not use sheet metal screws
at the hood flange connection. Doing so will prevent
proper damper operation. Seal connection with
tape only.
PRUDENCE :
Il ne faut pas utiliser de vis autoraurdeuses à la
connexion du collet de la hotte. Ceci empêcherait
le bon fonctionnement du registre. N’utiliser que du
ruban adhésif pour assurer l’étanchéité du raccord.
7
Duct tape
over seam
and screw
Screw
Airflow
Installation Instructions
INSTALLATION—VENTED TO THE OUTSIDE
12
MOUNT THE HOOD
WARNING:
2 people are required to lift and
position the hood onto the mounting bracket.
AVERTISSEMENT :
If faut deux personnes pour lever et mettre en place
la hotte sur le support de montage.
•
Lift the hood onto the mounting bracket.
• Position a spirit level at the bottom of the hood to
check side to side leveling.
5
LEVEL THE HOOD
This hood has built-in levelers on the mounting hooks
at each side. Use a long Phillips screwdriver from the
front to access the levelers.
•
Use the top screw hole in the leveler to raise or lower
the hood on that side.
•
Use the bottom screw hole to pull the hood tight
against the wall surface.
•
Mark hole location at the bottom of the hood.
•
Remove the hood. If the bottom screw hole does not
enter a stud, enlarge the hole to 3/8
″
and install wall
fastener anchors.
•
Place the hood back onto the mounting bracket,
check level again and install the wall fastener.
6
Screw hole
Levelers