18
INSTALLATION INSTRUCTIONS
(continued)
CHECK OPERATION
• Start the icemaker by turning the service
switch to “ON” and opening the line water valve.
• NOTE: Left is “OFF”—Middle is “ON”—Right
is “CLEAN.” In “CLEAN” position, only the
pump operates.
• Check the condenser fan to make sure it is
revolving.
• Water will not enter the pump pan until the
freezing plate gets cold and the icemaker goes
into a harvest cycle.
• Check for even water flow over the freezing
plate. The icemaker must be level for proper
operation.
• Check for desired cube thickness and after 24
hours adjust if necessary. Maximum ice yield will
be obtained with ice thickness at 1/2
″
to 5/8
″
.
• Replace the grille.
DRAIN PUMP
• When the drain connection is below the level of
the icemaker, a drain pump may be used to lift the
water to an available drain. Use only an approved
drain pump kit ZDK50 from your dealer.
• Complete installation instructions are included
with the drain pump kit.
Содержание Monogram ZDIW50
Страница 22: ...22 NOTES...
Страница 44: ...22 NOTAS...