6
Installation
Beverage Center & Wine Chiller
Remove all packing material and tape.
Tools and materials required:
• #2 Phillips screwdriver
Parts List:
A. Stainless tubular handle
B. 2 Handle standoffs
C. 3 Screws for mounting handle standoffs
(2 required, 1 extra)
D. 3 Set screws (2 required, 1 extra)
E. 3/32" Allen wrench for set screws
F. 4 U-Clips
G. 4 Leveling legs
H. GE Monogram nameplate
I. 8 Plug buttons
J. Hinge Shims
K. 2 Screws for light trigger hole
Remove the
Packaging
1
Step
Install
Handle
2
Step
Note:
Consider door swing direction. If you wish to change door
swing, complete the instructions shown on page 5 before installing
the handle.
• Place handle standoff against the top screw hole
in the door. Position the standoff so that the
small screw hole points toward the floor.
• Drive screw through the standoff and into the
door. Do not tighten.
• Install bottom standoff. Do not tighten.
• Place handle to standoffs so that handle mount-
ing posts are inserted into the standoffs. The
handle should fit into the curved shape of the
standoff. Again, the set screw hole should be
pointing downwards.
• Remove the handle and tighten standoffs to
door.
• Place handle to standoffs and install set screws
through the bottom of standoffs using the allen
wrench provided.
• The handle should be tight against the standoff.
• Save the allen wrench for future use.
Screw
Allen Wrench
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K
CAUTION:
Small objects are a choke
hazard to children. Remove and
discard any parts not used.
PRUDENCE
– Les petits objets
peuvent étrangler les enfants. Il faut
jeter toutes les pièces qui ne sont pas
utilisées.