background image

12

Installation

Stainless Steel Interior Dishwasher

Step 5
Level the
Dishwasher

Step 6
Slide
Dishwasher
Into Opening

• Carefully upright the dishwasher, taking

care not to bend the leveling legs. Make
sure the leveling leg locking nuts are
secure.

• Check to be sure the dishwasher is level and

at the cutout height.

• Insert drain hose into the hole previously

drilled in the cabinet wall.

• Slide the dishwasher into the opening a few

inches at a time.

• As you proceed, pull the drain hose

through the cabinet wall under the sink.

• If a power cord is used, guide the end

through a separate hole.

• Check to be sure there is no interference

with waterline or house wiring.

Step 7
Connect
Water Line

• The water supply line should be flushed to

clear any foreign material before connect-
ing to the dishwasher.

• Make sure there are no sharp bends or

kinks which could restrict the water flow.

Содержание Monogram ZBD5600

Страница 1: ...GE Monogram Installation Instructions with Optional Trim Kit Installation Instructions Built In Dishwashers Models ZBD5600 ZBD5700 ZBD5900...

Страница 2: ...lls Proper installation is the responsibility of the in staller Product failure due to improper installation is not covered under the GE Appliance Warranty See the Use Care Guide for warranty informat...

Страница 3: ...depending on depth of cabinets Advance Planning The black and white models may be covered with custom decorative door panels of wood or other materials to match cabinetry See Optional Trim Kits page 4...

Страница 4: ...black custom panel kit Provides for the installation of a 1 4 thick custom door panel See page 16 for installation instructions ZPF75W white or ZPF75B black custom panel kit Provides for a trimless ap...

Страница 5: ...rackets 2 side trim pieces 2 piece toekick 16 Screws see illustration 2 leveling legs Junction box 2 Leveling Legs Screw A 2 Countertop Mounting Screws Screw B 4 Side Trim Screws Screw C 4 Toekick Bra...

Страница 6: ...ecommended Water line 3 8 O D min copper or 1 2 O D min plastic Phillips head and flat blade screwdrivers Adjustable wrench 6 3 8 5 16 and 1 4 nut drivers Level Carpenter s square Measuring tape Safet...

Страница 7: ...he shut off valve is optional but recommended and may be required by local codes Install the hot water line using no less than 3 8 O D copper tubing or 1 2 O D plastic tubing The water line must be lo...

Страница 8: ...PLIANCE FOLLOW NATIONAL ELECTRICAL CODES OR PREVAILING LOCAL CODES AND ORDINANCES Cabinet Preparation Wiring Wiring may enter from either side the rear or from the floor within the shaded area shown C...

Страница 9: ...Disposer Use this method when waste tee or disposer connection is less than 12 above the floor An air gap MUST BE USED if the drain hose is connected to waste tee or disposer lower than 12 above the f...

Страница 10: ...ge The legs should be at least 2 from the bottom edge of the mounting bracket Adjust leveling legs to installation height Tighten leveling leg locking nuts on the rear Cut the shipping carton and use...

Страница 11: ...tighten against incoming wires Strip 1 2 insulation from end of power cord wires Connect incoming wires to dishwasher wires using wire nuts of appropriate size Connect the white to white black to blac...

Страница 12: ...the hole previously drilled in the cabinet wall Slide the dishwasher into the opening a few inches at a time As you proceed pull the drain hose through the cabinet wall under the sink If a power cord...

Страница 13: ...relief onto the junction box and tighten against the incoming wires Strip 1 2 insulation from end of incoming wires Use wire nuts of appropriate size and con nect white to white black to black and in...

Страница 14: ...to insure proper operation of the door If there is any binding or rubbing readjust leveling legs Secure dishwasher to countertop Drill pilot holes through the mounting bracket and into the underside o...

Страница 15: ...liding the front panel down even with the floor Carefully hold the door and open fully Ensure that door does not strike top of toekick Adjust toekick height if necessary Tighten screws Step 11 Install...

Страница 16: ...s screwdriver Gloves to protect against sharp edges Step 1 Cut 1 4 Thick Custom Panel to Size 1 4 Thick Door Panel 25 1 2 23 1 8 1 4 Radius Cut Note It is best that 2 people perform this installation...

Страница 17: ...door using original screws Place insulation around support bracket Step 4 Install Door Center Bracket Step 2 Remove Existing Metal Door Open the door fully Caution One person should hold the door whil...

Страница 18: ...lease the tension on the spring and remove the push rod guide from the rod Remove the spring and replace with the spring that has a yellow marking Reassemble the push rod guide into the original posit...

Страница 19: ...ings Metal Door Support Bracket Dim A Height 23 1 8 Custom Panel Size Floor Cabinets Countertop Top 3 4 Max 3 4 Thick Door Panel Bottom of Adjacent Cabinetry Height is equal to A minus 5 1 8 plus 1 4...

Страница 20: ...acket Install new center door bracket onto door using screws Z Place insulation around support bracket Step 4 Assemble Custom Panel Lay custom panel on a flat surface appear ance side down Place the n...

Страница 21: ...nd under the door slowly open the door fully Open and close the door to check for proper balance Correct door balance should prevent the door from raising by itself from a full open position and preve...

Страница 22: ...nd secure panel to slides with 2 screws each Use screws X If panels are 1 2 thick use caution when driving these screws Insert the assembled toekick into the support brackets by pulling out the metal...

Страница 23: ...23 Notes Stainless Steel Interior Dishwasher...

Страница 24: ...erning any Monogram product or service call GE Answer Center consumer information service at 800 626 2000 any time day or night For Monogram local service in your area call 1 800 444 1845 In Canada ca...

Отзывы: