background image

10 B

  

INSTALL MOUNTING SCREWS (THERMAL OVENS)

WARNING

 Mounting screws must be 

used. Failure to do so could result in the oven 
falling out of the cabinet, causing serious injury.

NOTE:

 During oven mounting step, ensure that 

no damage is done to oven gasket which lines 
the edge of oven cavity.

NOTE:

 Before drilling the pilot holes, make 

sure the oven is pushed as far back into the 
opening as it will go and is centered.

NOTE:

 If the cabinet is particle board, you 

must use #8 x ¾” particle board screws. These 
may be purchased at any hardware store.

A.

  Drill through the mounting holes (top and 

bottom) of the side trim for the #8 mounting 
screws provided.

B. 

 Secure the oven cabinet with the screws 
provided.

10 A

  

INSTALL MOUNTING SCREWS 
(UPPER OVEN ON COMBINATION OVENS)

•   Slide the oven the remaining way into 

the opening so that the side flanges and 
control panel are against the cabinet 
frame. Make sure that the oven is 
centered in the opening.

•   Open the door, place a turntable tray in 

the oven and make sure that the tray in 
the unit is level.

•   Drill pilot holes through the side flanges.
•   Drive the color-matched screws into the 

side flanges. It is recommended that the 
screws be hand tightened.

Mounting 

Hole 

Locations 

(hole locations 

may vary)

The Screws 

Must Be a 

Minimum of 

1/4” (6 mm) 

From the 

Front of  

the Cutout.

9

  SLIDE OVEN INTO OPENING

A.

  Loop 

(do not tie)

 a 36” (91 cm) string around the conduit before the oven is slid into place. 

This will keep the conduit from falling behind the oven.

B.

  Lift oven into cabinet cutout 

using the oven opening as a 
grip. Carefully push against 
oven front frame. Do not push 
against outside edges.

C.

  As you slide the oven back, pull 

the string so that the conduit 
will lie on top of the oven in a 
natural loop. For a combination 
oven, pull the conduit so that 
it sits above the lower oven on 
the left side (as viewed from 
the front).

D.

  When you are sure the conduit 

is out of the way, slide the oven 
¾ way back into the opening. 
Remove the string by pulling on 
one end of the loop.

31-11161   04-18   GEA

Pull Out 

on String 

Loop While 

Pushing  

the Oven Into 

the Cabinet

8

  FOUR-CONDUCTOR BRANCH CIRCUIT CONNECTION

NOTE: 

If residence leads are aluminum conductors, see WARNING in Section 5, Electrical 

Requirements.
When connecting to a four-conductor branch circuit, if local 
codes permit:

A.

  Free the neutral (white) lead from being restrained to any 

other wires. If necessary, cut the neutral (white) lead and 
then re-strip it to expose the proper length of conductor.

B.

  Attach the appliance grounding lead (green or bare copper) 

in accordance with local codes. 

C.

  Connect the oven neutral (white) lead to the branch circuit 

neutral (white or gray) in accordance with local codes, using 
a wire nut.

D.

  Connect the oven red lead to the branch circuit red lead and 

the oven black lead to the branch circuit black lead in ac cor-
dance with local codes, using wire nuts. 

E.

  Install proper strain relief clamp.

F.

  Install junction box cover.

Junction Box Cover

White

Black

Red

Branch 

circuit

Ground 

wires

Alternate 

knockout

Range 

conduit 

snaps 

into box

Some models have custom handles. Please follow the instructions with the handles for 
proper installation.

Содержание Monogram MOCTWODW108

Страница 1: ...o remove plastic on trims and panel all tape around the oven and any shipping screws securing the oven to the base pad Open oven door and remove literature pack and oven racks Remove the bottom trim from the top of the oven It will be installed at the end of the installation process The trim is wrapped separately and taped to the top of the unit Remove pedestal rails from separate box and set asid...

Страница 2: ...30 Single Oven A Cabinet Width 25 63 5 cm min 251 4 64 1 cm max 281 2 72 4 cm min 285 8 72 7 cm max B Cutout Height 275 8 70 2 cm min 281 8 71 4 cm max 271 4 69 2 cm min 275 16 69 4 cm max C Clearance from cutout top 1 2 5 cm 1 2 5 cm 11 4 3 2 cm for PT9050 ZET1S and ZET1P D Clearance from cutout bottom 1 2 5 cm 11 4 3 2 cm E Clearance from cutout side edges 1 2 5 cm 11 16 1 75 cm F Junction Box L...

Страница 3: ...n 11 4 3 2 cm 11 4 3 2 cm H Junction Box Location 83 4 22 2 cm max right side only 91 2 24 1 cm max right side only 91 2 24 1 cm max right side only J Height to Bottom of Junction Box 44 111 8 cm 47 119 4 cm 47 119 4 cm K Recommended Cutout Location from Floor 131 4 33 7 cm 12 30 5 cm 12 30 5 cm Dim Description 27 Oven with Microwave 30 Oven with Microwave A Cabinet Width 27 68 6 cm 30 76 2 cm B C...

Страница 4: ...ement 2 5 1 cm Min Per Warming Drawer Requirement Continue to Section 3 for Double Wall Oven with Pedestal Otherwise continue to Section 4 3 A DETERMINING WHEN TO USE THE PEDESTAL 30 DOUBLE OVENS ONLY WHEN TO USE THE PEDESTAL When replacing an older GE Appliances 30 double wall oven with a new GE Appliances model Cutout height 51 13 16 to 51 15 16 This is our traditional cutout height WHEN NOT TO ...

Страница 5: ... WARNING To prevent shock remove house fuse or open circuit breaker before beginning installation WARNING Improper connection of aluminum house wiring to copper leads can result in an electrical hazard or fire Use only connectors designed for joining copper to aluminum and follow the manufacturer s recommended procedure closely We recommend you have the electrical wiring and hookup of your applian...

Страница 6: ... and the oven black lead to the branch circuit black lead in accordance with local codes using wire nuts C Install proper strain relief clamp D Install junction box cover Ground and neutral wires white Tape or Crimp Neutral wire connection Black Red Branch circuit Alternate knockout Range conduit snaps into box Junction Box Cover 5 ELECTRICAL REQUIREMENTS CONT This appliance must be supplied with ...

Страница 7: ... oven B Lift oven into cabinet cutout using the oven opening as a grip Carefully push against oven front frame Do not push against outside edges C As you slide the oven back pull the string so that the conduit will lie on top of the oven in a natural loop For a combination oven pull the conduit so that it sits above the lower oven on the left side as viewed from the front D When you are sure the c...

Страница 8: ...y see Section 11 Ensure that air duct opening at bottom of unit is free of obstructions Check that oven rack guides if applicable are installed correctly and oven racks function smoothly If applicable install handles following handle installation instructions and check that both ends are secured OPERATION CHECKLIST Turn on the power to the oven refer to your Owner s Manual Verify that the bake and...

Страница 9: ...ordes y panel toda la cinta que cubre el horno y los tornillos de envío que fijan el horno a la almohadilla base Abra la puerta del horno y quite el material informativo y las bandejas del horno Quite el reborde inferior de la parte superior del horno Se colocará al final del proceso de instalación El reborde se encuentra envuelto en forma separada y adherido en la parte superior de la unidad Reti...

Страница 10: ...abinete 25 63 5 cm mín 251 4 64 1 cm máx 281 2 72 4 cm mín 285 8 72 7 cm máx B Altura de la abertura 275 8 70 2 cm mín 281 8 71 4 cm máx 271 4 69 2 cm mín 275 16 69 4 cm máx C Espacio desde la abertura parte superior 1 2 5 cm 1 2 5 cm 11 4 3 2 cm para PT9050 ZET1S y ZET1P D Espacio desde la abertura parte inferior 1 2 5 cm 11 4 3 2 cm E Espacio desde la abertura extremos laterales 1 2 5 cm 11 16 1...

Страница 11: ...rtura parte superior 1 2 5 cm min 1 2 5 cm min 11 4 3 2 cm para PT9550 ZET2S y ZET2P 1 2 5 cm min 11 4 3 2 cm para PT9550 ZET2S y ZET2P G Espacio desde la abertura parte inferior 1 2 5 cm min 11 4 3 2 cm 11 4 3 2 cm H Ubicación de la caja de conexiones 83 4 22 2 cm max sólo lado derecho 91 2 24 1 cm max sólo lado derecho 91 2 24 1 cm max sólo lado derecho J Altura hasta la parte inferior de la caj...

Страница 12: ...gabinete se encuentra en la condición de ancho máximo repare los tacos de madera como se muestra en la ilustración 3 B INSTALACIÓN DEL RIEL CON PEDESTAL 30 HORNOS DOBLES ÚNICAMENTE A Posicione los rieles del pedestal con la abertura superior hacia el frente de la abertura y las lengüetas de la parte inferior apuntando hacia el centro Ubique cada riel sobre el piso o la corredera del gabinete levem...

Страница 13: ... este aparato ADVERTENCIA Para prevenir una descarga eléctrica quite el fusible o abra el interruptor de circuitos antes de comenzar la instalación ADVERTENCIA Una conexión inadecuada de cableado doméstico de aluminio con cables de cobre puede generar un peligro eléctrico o un incendio Sólo use conectores diseñados para unir cobre con aluminio y siga al pie de la letra el procedimiento recomendado...

Страница 14: ...1 kg Conecte el conducto flexible a la caja de conexiones eléctrica como se indica abajo Posicione el conducto de modo tal que se apoye detrás de la unidad en un círculo natural cuando el horno sea instalado Tendrá que comprar una abrazadera para alivio de tensión apropiada para completar la conexión del conducto a la caja de conexiones Los hornos vienen equipados con un conducto de 40 o 54 de lon...

Страница 15: ...s locales A Evite que el conductor neutro blanco quede enredado con cualquier otro cable De ser necesario corte el conductor neutro blanco y luego vuelva a pelar el mismo a fin de exponer la longitud adecuada del conductor B Conecte el cable a tierra del aparato verde o cobre de acuerdo con los códigos locales C Conecte el cable neutral blanco del horno con el neutral de circuito derivado blanco o...

Страница 16: ... obstrucciones Controle que las guías de los estantes del horno si corresponde estén instaladas de forma correcta y que los estantes del horno funcionen de forma fluida Si corresponde instale las manijas siguiendo las instrucciones de instalación de las mismas y controle que ambos extremos se encuentren asegurados LISTA DE CONTROL DE FUNCIONAMIENTO Accione la energía del horno consulte el Manual d...

Отзывы: