background image

2 C

  

CUTOUT FOR DOUBLE OVENS (2 THERMAL OVENS)

NOTE:

 If the cabinet does not have a front frame and the sides are less than ¾” (1.9 cm) thick, 

shim both sides equally to establish the cutout width.

2 D

  

CUTOUT FOR COMBINATION OVENS 

(WITH UPPER MICROWAVE OVEN)

NOTE:

 If the cabinet does not have a front frame and the sides are less than ¾” (1.9 cm) thick, 

shim both sides equally to establish the cutout width.

Dim.

Description

27” Double Oven

30” Double Oven with 

Pedestal

30” Double Oven 

without Pedestal

A

Cabinet Width

27” (68.6 cm)

30” (76.2 cm)

30” (76.2 cm)

B

Cutout Width

25” (63.5 cm) min.  

25

1

»

4

” (64.1 cm) max.

28

1

»

2

” (72.4 cm) min.  

28

5

»

8

” (72.7 cm) max.

28

1

»

2

” (72.4 cm) min.  

28

5

»

8

” (72.7 cm) max.

C

Cutout Height

49

11

»

16

” (126.2 cm) min.  

50

1

»

8

” (127.3 cm) max.

51

13

»

16

” (131.6 cm) min.  

51

15

»

16

” (131.9 cm) max.

50 ¼” (127.64cm) 

D

Clearance from 

cutout - side 

edges*

1” (2.5 cm)

11

»

16

” (1.75 cm)

11

»

16

” (1.75 cm)

E

Clearance to 

Adjacent Corners, 

Drawers, Walls, etc., 

When Door Is Open

23” (50.8 cm) min.

23” (53.3 cm) min.

23” (53.3 cm) min.

F

Clearance from 

cutout - top*

1” (2.5 cm) min.

1” (2.5 cm) min. 

(1

1

»

4

” (3.2 cm) for 

PT9550, ZET2S and 

ZET2P)

1” (2.5 cm) min. 

(1

1

»

4

” (3.2 cm) for 

PT9550, ZET2S and 

ZET2P)

G

Clearance from 

cutout - bottom*

1” (2.5 cm) min.

1

1

»

4

” (3.2 cm)

1

1

»

4

” (3.2 cm)

H

Junction Box 

Location 

8

3

»

4

” (22.2 cm) max. 

right side only

9

1

»

2

” (24.1 cm) max. 

right side only

9

1

»

2

” (24.1 cm) max. 

right side only

J

Height to Bottom 

of Junction Box

44” (111.8 cm)

47” (119.4 cm)

47” (119.4 cm)

K

Recommended 

Cutout Location 

from Floor

13

1

»

4

” (33.7 cm)

12” (30.5 cm)

12” (30.5 cm)

Dim.

Description

27” Oven 

with Microwave

30” Oven 

with Microwave

A

Cabinet Width

27” (68.6 cm)

30” (76.2 cm)

B

Cutout Width

25” (63.5 cm) min.  

25

1

»

4

” (64.1 cm) max.

28

1

»

2

” (72.4 cm) min.  

28

5

»

8

” (72.7 cm) max.

C

Cutout Height

41

1

»

8

” (104.5 cm) min.  

41

1

»

4

” (104.8 cm) max.

42

3

»

16

” (107.2 cm) min.  

42

1

»

4

” (107.3 cm) max.

D

Clearance from cutout - 

side edges*

1” (2.5 cm)

11

»

16

” (1.75 cm)

E

Clearance to Adjacent Corners, 

Drawers, Walls, etc., When Door 

Is Open

23” (58.4 cm) min.

23” (58.4 cm)

F

Clearance from cutout - top*

1” (2.5 cm) min.

1” (2.5 cm) min.

G

Clearance from cutout - 

bottom*

1” (2.5 cm) min.

1

1

»

4

” (3.2 cm)

H

Junction Box Location 

8

3

»

4

” (22.2 cm) max. 

right side only

9

1

»

2

” (24.1 cm) max. 

right side only

Continue to Section 3.

Continue to Section 2E.

H

B

C

K

F

G

D

A

J

E

Junction 

Box 

Location 

(junction 

box may 

be located 

in adjacent 

cabinet)

Cutout Depth  

23-1/2”  

(59.7 cm) Min.

31-11161   04-18   GEA

*  Refers to minimum clearance required for wall oven installation and does not reflect actual product dimensions.

*  Refers to minimum clearance required for wall oven installation and does not reflect actual product dimensions.

Содержание Monogram MOCTWODW108

Страница 1: ...o remove plastic on trims and panel all tape around the oven and any shipping screws securing the oven to the base pad Open oven door and remove literature pack and oven racks Remove the bottom trim from the top of the oven It will be installed at the end of the installation process The trim is wrapped separately and taped to the top of the unit Remove pedestal rails from separate box and set asid...

Страница 2: ...30 Single Oven A Cabinet Width 25 63 5 cm min 251 4 64 1 cm max 281 2 72 4 cm min 285 8 72 7 cm max B Cutout Height 275 8 70 2 cm min 281 8 71 4 cm max 271 4 69 2 cm min 275 16 69 4 cm max C Clearance from cutout top 1 2 5 cm 1 2 5 cm 11 4 3 2 cm for PT9050 ZET1S and ZET1P D Clearance from cutout bottom 1 2 5 cm 11 4 3 2 cm E Clearance from cutout side edges 1 2 5 cm 11 16 1 75 cm F Junction Box L...

Страница 3: ...n 11 4 3 2 cm 11 4 3 2 cm H Junction Box Location 83 4 22 2 cm max right side only 91 2 24 1 cm max right side only 91 2 24 1 cm max right side only J Height to Bottom of Junction Box 44 111 8 cm 47 119 4 cm 47 119 4 cm K Recommended Cutout Location from Floor 131 4 33 7 cm 12 30 5 cm 12 30 5 cm Dim Description 27 Oven with Microwave 30 Oven with Microwave A Cabinet Width 27 68 6 cm 30 76 2 cm B C...

Страница 4: ...ement 2 5 1 cm Min Per Warming Drawer Requirement Continue to Section 3 for Double Wall Oven with Pedestal Otherwise continue to Section 4 3 A DETERMINING WHEN TO USE THE PEDESTAL 30 DOUBLE OVENS ONLY WHEN TO USE THE PEDESTAL When replacing an older GE Appliances 30 double wall oven with a new GE Appliances model Cutout height 51 13 16 to 51 15 16 This is our traditional cutout height WHEN NOT TO ...

Страница 5: ... WARNING To prevent shock remove house fuse or open circuit breaker before beginning installation WARNING Improper connection of aluminum house wiring to copper leads can result in an electrical hazard or fire Use only connectors designed for joining copper to aluminum and follow the manufacturer s recommended procedure closely We recommend you have the electrical wiring and hookup of your applian...

Страница 6: ... and the oven black lead to the branch circuit black lead in accordance with local codes using wire nuts C Install proper strain relief clamp D Install junction box cover Ground and neutral wires white Tape or Crimp Neutral wire connection Black Red Branch circuit Alternate knockout Range conduit snaps into box Junction Box Cover 5 ELECTRICAL REQUIREMENTS CONT This appliance must be supplied with ...

Страница 7: ... oven B Lift oven into cabinet cutout using the oven opening as a grip Carefully push against oven front frame Do not push against outside edges C As you slide the oven back pull the string so that the conduit will lie on top of the oven in a natural loop For a combination oven pull the conduit so that it sits above the lower oven on the left side as viewed from the front D When you are sure the c...

Страница 8: ...y see Section 11 Ensure that air duct opening at bottom of unit is free of obstructions Check that oven rack guides if applicable are installed correctly and oven racks function smoothly If applicable install handles following handle installation instructions and check that both ends are secured OPERATION CHECKLIST Turn on the power to the oven refer to your Owner s Manual Verify that the bake and...

Страница 9: ...ordes y panel toda la cinta que cubre el horno y los tornillos de envío que fijan el horno a la almohadilla base Abra la puerta del horno y quite el material informativo y las bandejas del horno Quite el reborde inferior de la parte superior del horno Se colocará al final del proceso de instalación El reborde se encuentra envuelto en forma separada y adherido en la parte superior de la unidad Reti...

Страница 10: ...abinete 25 63 5 cm mín 251 4 64 1 cm máx 281 2 72 4 cm mín 285 8 72 7 cm máx B Altura de la abertura 275 8 70 2 cm mín 281 8 71 4 cm máx 271 4 69 2 cm mín 275 16 69 4 cm máx C Espacio desde la abertura parte superior 1 2 5 cm 1 2 5 cm 11 4 3 2 cm para PT9050 ZET1S y ZET1P D Espacio desde la abertura parte inferior 1 2 5 cm 11 4 3 2 cm E Espacio desde la abertura extremos laterales 1 2 5 cm 11 16 1...

Страница 11: ...rtura parte superior 1 2 5 cm min 1 2 5 cm min 11 4 3 2 cm para PT9550 ZET2S y ZET2P 1 2 5 cm min 11 4 3 2 cm para PT9550 ZET2S y ZET2P G Espacio desde la abertura parte inferior 1 2 5 cm min 11 4 3 2 cm 11 4 3 2 cm H Ubicación de la caja de conexiones 83 4 22 2 cm max sólo lado derecho 91 2 24 1 cm max sólo lado derecho 91 2 24 1 cm max sólo lado derecho J Altura hasta la parte inferior de la caj...

Страница 12: ...gabinete se encuentra en la condición de ancho máximo repare los tacos de madera como se muestra en la ilustración 3 B INSTALACIÓN DEL RIEL CON PEDESTAL 30 HORNOS DOBLES ÚNICAMENTE A Posicione los rieles del pedestal con la abertura superior hacia el frente de la abertura y las lengüetas de la parte inferior apuntando hacia el centro Ubique cada riel sobre el piso o la corredera del gabinete levem...

Страница 13: ... este aparato ADVERTENCIA Para prevenir una descarga eléctrica quite el fusible o abra el interruptor de circuitos antes de comenzar la instalación ADVERTENCIA Una conexión inadecuada de cableado doméstico de aluminio con cables de cobre puede generar un peligro eléctrico o un incendio Sólo use conectores diseñados para unir cobre con aluminio y siga al pie de la letra el procedimiento recomendado...

Страница 14: ...1 kg Conecte el conducto flexible a la caja de conexiones eléctrica como se indica abajo Posicione el conducto de modo tal que se apoye detrás de la unidad en un círculo natural cuando el horno sea instalado Tendrá que comprar una abrazadera para alivio de tensión apropiada para completar la conexión del conducto a la caja de conexiones Los hornos vienen equipados con un conducto de 40 o 54 de lon...

Страница 15: ...s locales A Evite que el conductor neutro blanco quede enredado con cualquier otro cable De ser necesario corte el conductor neutro blanco y luego vuelva a pelar el mismo a fin de exponer la longitud adecuada del conductor B Conecte el cable a tierra del aparato verde o cobre de acuerdo con los códigos locales C Conecte el cable neutral blanco del horno con el neutral de circuito derivado blanco o...

Страница 16: ... obstrucciones Controle que las guías de los estantes del horno si corresponde estén instaladas de forma correcta y que los estantes del horno funcionen de forma fluida Si corresponde instale las manijas siguiendo las instrucciones de instalación de las mismas y controle que ambos extremos se encuentren asegurados LISTA DE CONTROL DE FUNCIONAMIENTO Accione la energía del horno consulte el Manual d...

Отзывы: