M
Millenium™ RO System by GE Osmonics
14693e - 31 Mar 03
4- 18
Routine Maintenance
4.4
Millenium™ Disinfection Indications
DETERMINATION OF MICROBIAL CULTURING AND DISINFECTION
FREQUENCY IS THE RESPONSIBILITY OF THE OPERATING FACILITY.
The following is recommended for critical applications where bacteria and endotoxins
are a major concern, such as for Hemodialysis.
Disinfection should occur when bacterial growth is above the limits set by the facility, or
when over 200 CFU/ml (maximum AAMI standard) is detected. Routine disinfection at
lower CFU counts will inhibit colonization of bacteria in the system and the distribution
plumbing.
Rapid re-growth of bacteria following disinfection, or excessively high colony counts
(i.e. TNTC), may indicate a need for more aggressive intervention. Strategies such as
increased frequency of disinfection, longer dwell times, or alternative chemical agents
may be employed.
CAUTION:
Glutaraldehyde and Actril™ are not recommended disinfectants for the
Millenium™.
4.4.1
Formaldehyde Disinfection Preparation
CAUTION:
New replacement thin film membranes must be rinsed to drain with normal
pressures for a minimum of six (6) hours before first exposure to formaldehyde, or
irreversible damage may occur. No mandatory pre-rinse of the membranes is
required for future disinfections.
WARNING:
Always wear rubber gloves, apron and facemask. Use proper ventilation during
disinfection and rinse-out. A face respirator with an organic cartridge to remove
formaldehyde fumes may be worn. DO NOT BREATHE FUMES OR ALLOW
FORMALDEHYDE TO COME IN CONTACT WITH SKIN OR EYES. Refer to
MSDS supplied by manufacturer of the formaldehyde or formalin product.
Materials Required:
•
800 ml. Formaldehyde, 37%
•
2 gallons pre treated or RO water
•
clean wide mouth container with volume of 2 ½ gallon or more
•
formaldehyde test kit
•
product rinse line (clear hose with male QD fitting on one end, open on other)
•
“DO NOT USE” warning labels or signs (not provided by Osmonics)
•
cleaning / disinfect log sheets
•
most current log sheets for water quality comparison
•
proper protective body wear
WARNING:
Содержание MILLENIUM OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT
Страница 2: ......
Страница 6: ...14693e D D 31 March 2003 This page intentionally left blank ...
Страница 24: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 1 18 General Information NOTES ...
Страница 36: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 3 5 5 System Operation NOTES ...
Страница 44: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 4 7 Routine Maintenance Tubing connections ...
Страница 67: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 4 30 Routine Maintenance NOTES ...
Страница 69: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 5 2 Troubleshooting This page intentionally left blank ...
Страница 71: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 5 4 Troubleshooting This page intentionally left blank ...
Страница 80: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 5 13 Troubleshooting NOTES ...
Страница 81: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 5 14 Troubleshooting This page intentionally left blank ...
Страница 82: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 6 1 Drawings Millenium RO System CHAPTER SIX DRAWINGS ...
Страница 83: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 6 2 Drawings This page intentionally left blank ...
Страница 84: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 6 3 Drawings Millenium RO Component Layout ...
Страница 85: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 6 4 Drawings Millenium RO Disinfect View ...
Страница 86: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 6 5 Drawings Millenium RO Flow Schematic ...
Страница 96: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 6 15 Drawings Push In Fitting Instructions ...
Страница 97: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 6 16 Drawings This page intentionally left blank ...
Страница 98: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 6 17 Drawings NOTES ...
Страница 99: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 6 18 Drawings This page intentionally left blank ...
Страница 101: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 7 2 Spare Parts List This page intentionally left blank ...
Страница 105: ...M Millenium RO System by GE Osmonics 14693e 31 Mar 03 7 6 Spare Parts List NOTES ...
Страница 106: ......