
3.4.2
SYSTEM LEVEL SOFTWARE INITIALISATION
The initialization process initializes the processor registers and interrupts, starts the watchdog timers (used by the
hardware to determine whether the software is still running), starts the real-time operating system and creates
and starts the supervisor task. In the initialization process the device checks the following:
●
The status of the backup battery
●
The integrity of the battery-backed SRAM that is used to store event, fault and disturbance records
●
The operation of the LCD controller
●
The watchdog operation
At the conclusion of the initialization software the supervisor task begins the process of starting the platform
software. Coprocessor board checks are also made as follows:
●
A check is made for the presence of the coprocessor board
●
The RAM on the coprocessor board is checked with a test bit pattern before the coprocessor board is
transferred from flash memory
If any of these checks produces an error, the coprocessor board is left out of service. The other protection
functions provided by the main processor board are left in service.
3.4.3
PLATFORM SOFTWARE INITIALISATION AND MONITORING
When starting the platform software, the IED checks the following:
●
The integrity of the data held in non-volatile memory (using a checksum)
●
The operation of the real-time clock
●
The optional IRIG-B function (if applicable)
●
The presence and condition of the input board
●
The analog data acquisition system (it does this by sampling the reference voltage)
At the successful conclusion of all of these tests the unit is entered into service and the application software is
started up.
3.5
CONTINUOUS SELF-TESTING
When the IED is in service, it continually checks the operation of the critical parts of its hardware and software. The
checking is carried out by the system services software and the results are reported to the platform software. The
functions that are checked are as follows:
●
The Flash memory containing all program code and language text is verified by a checksum.
●
The code and constant data held in system memory is checked against the corresponding data in Flash
memory to check for data corruption.
●
The system memory containing all data other than the code and constant data is verified with a checksum.
●
The integrity of the digital signal I/O data from the opto-inputs and the output relay coils is checked by the
data acquisition function every time it is executed.
●
The operation of the analog data acquisition system is continuously checked by the acquisition function
every time it is executed. This is done by sampling the reference voltages.
●
The operation of the optional Ethernet board is checked by the software on the main processor card. If the
Ethernet board fails to respond an alarm is raised and the card is reset in an attempt to resolve the problem.
●
The operation of the optional IRIG-B function is checked by the software that reads the time and date from
the board.
In the event that one of the checks detects an error in any of the subsystems, the platform software is notified and
it attempts to log a maintenance record.
Chapter 4 - Software Design
P446SV
62
P446SV-TM-EN-1
Содержание MiCOM P40 Agile
Страница 2: ......
Страница 24: ...Contents P446SV xxii P446SV TM EN 1 ...
Страница 33: ...CHAPTER 1 INTRODUCTION ...
Страница 34: ...Chapter 1 Introduction P446SV 2 P446SV TM EN 1 ...
Страница 46: ...Chapter 1 Introduction P446SV 14 P446SV TM EN 1 ...
Страница 47: ...CHAPTER 2 SAFETY INFORMATION ...
Страница 48: ...Chapter 2 Safety Information P446SV 16 P446SV TM EN 1 ...
Страница 60: ...Chapter 2 Safety Information P446SV 28 P446SV TM EN 1 ...
Страница 61: ...CHAPTER 3 HARDWARE DESIGN ...
Страница 62: ...Chapter 3 Hardware Design P446SV 30 P446SV TM EN 1 ...
Страница 88: ...Chapter 3 Hardware Design P446SV 56 P446SV TM EN 1 ...
Страница 89: ...CHAPTER 4 SOFTWARE DESIGN ...
Страница 90: ...Chapter 4 Software Design P446SV 58 P446SV TM EN 1 ...
Страница 101: ...CHAPTER 5 CONFIGURATION ...
Страница 102: ...Chapter 5 Configuration P446SV 70 P446SV TM EN 1 ...
Страница 124: ...Chapter 5 Configuration P446SV 92 P446SV TM EN 1 ...
Страница 125: ...CHAPTER 6 SAMPLED VALUE OPERATION ...
Страница 126: ...Chapter 6 Sampled Value Operation P446SV 94 P446SV TM EN 1 ...
Страница 136: ...Chapter 6 Sampled Value Operation P446SV 104 P446SV TM EN 1 ...
Страница 137: ...CHAPTER 7 DISTANCE PROTECTION ...
Страница 138: ...Chapter 7 Distance Protection P446SV 106 P446SV TM EN 1 ...
Страница 196: ...Chapter 7 Distance Protection P446SV 164 P446SV TM EN 1 ...
Страница 197: ...CHAPTER 8 CARRIER AIDED SCHEMES ...
Страница 198: ...Chapter 8 Carrier Aided Schemes P446SV 166 P446SV TM EN 1 ...
Страница 240: ...Chapter 8 Carrier Aided Schemes P446SV 208 P446SV TM EN 1 ...
Страница 241: ...CHAPTER 9 NON AIDED SCHEMES ...
Страница 242: ...Chapter 9 Non Aided Schemes P446SV 210 P446SV TM EN 1 ...
Страница 256: ...Chapter 9 Non Aided Schemes P446SV 224 P446SV TM EN 1 ...
Страница 257: ...CHAPTER 10 POWER SWING FUNCTIONS ...
Страница 258: ...Chapter 10 Power Swing Functions P446SV 226 P446SV TM EN 1 ...
Страница 281: ...CHAPTER 11 AUTORECLOSE ...
Страница 282: ...Chapter 11 Autoreclose P446SV 250 P446SV TM EN 1 ...
Страница 376: ...Chapter 11 Autoreclose P446SV 344 P446SV TM EN 1 ...
Страница 377: ...CHAPTER 12 CB FAIL PROTECTION ...
Страница 378: ...Chapter 12 CB Fail Protection P446SV 346 P446SV TM EN 1 ...
Страница 389: ...CHAPTER 13 CURRENT PROTECTION FUNCTIONS ...
Страница 390: ...Chapter 13 Current Protection Functions P446SV 358 P446SV TM EN 1 ...
Страница 416: ...Chapter 13 Current Protection Functions P446SV 384 P446SV TM EN 1 ...
Страница 417: ...CHAPTER 14 VOLTAGE PROTECTION FUNCTIONS ...
Страница 418: ...Chapter 14 Voltage Protection Functions P446SV 386 P446SV TM EN 1 ...
Страница 431: ...CHAPTER 15 FREQUENCY PROTECTION FUNCTIONS ...
Страница 432: ...Chapter 15 Frequency Protection Functions P446SV 400 P446SV TM EN 1 ...
Страница 438: ...Chapter 15 Frequency Protection Functions P446SV 406 P446SV TM EN 1 ...
Страница 439: ...CHAPTER 16 MONITORING AND CONTROL ...
Страница 440: ...Chapter 16 Monitoring and Control P446SV 408 P446SV TM EN 1 ...
Страница 476: ...Chapter 16 Monitoring and Control P446SV 444 P446SV TM EN 1 ...
Страница 477: ...CHAPTER 17 SUPERVISION ...
Страница 478: ...Chapter 17 Supervision P446SV 446 P446SV TM EN 1 ...
Страница 490: ...Chapter 17 Supervision P446SV 458 P446SV TM EN 1 ...
Страница 491: ...CHAPTER 18 DIGITAL I O AND PSL CONFIGURATION ...
Страница 492: ...Chapter 18 Digital I O and PSL Configuration P446SV 460 P446SV TM EN 1 ...
Страница 504: ...Chapter 18 Digital I O and PSL Configuration P446SV 472 P446SV TM EN 1 ...
Страница 505: ...CHAPTER 19 FIBRE TELEPROTECTION ...
Страница 506: ...Chapter 19 Fibre Teleprotection P446SV 474 P446SV TM EN 1 ...
Страница 522: ...Chapter 19 Fibre Teleprotection P446SV 490 P446SV TM EN 1 ...
Страница 523: ...CHAPTER 20 ELECTRICAL TELEPROTECTION ...
Страница 524: ...Chapter 20 Electrical Teleprotection P446SV 492 P446SV TM EN 1 ...
Страница 534: ...Chapter 20 Electrical Teleprotection P446SV 502 P446SV TM EN 1 ...
Страница 535: ...CHAPTER 21 COMMUNICATIONS ...
Страница 536: ...Chapter 21 Communications P446SV 504 P446SV TM EN 1 ...
Страница 606: ...Chapter 21 Communications P446SV 574 P446SV TM EN 1 ...
Страница 607: ...CHAPTER 22 CYBER SECURITY ...
Страница 608: ...Chapter 22 Cyber Security P446SV 576 P446SV TM EN 1 ...
Страница 625: ...CHAPTER 23 INSTALLATION ...
Страница 626: ...Chapter 23 Installation P446SV 594 P446SV TM EN 1 ...
Страница 637: ...CHAPTER 24 COMMISSIONING INSTRUCTIONS ...
Страница 638: ...Chapter 24 Commissioning Instructions P446SV 606 P446SV TM EN 1 ...
Страница 695: ...CHAPTER 25 MAINTENANCE AND TROUBLESHOOTING ...
Страница 696: ...Chapter 25 Maintenance and Troubleshooting P446SV 664 P446SV TM EN 1 ...
Страница 712: ...Chapter 25 Maintenance and Troubleshooting P446SV 680 P446SV TM EN 1 ...
Страница 713: ...CHAPTER 26 TECHNICAL SPECIFICATIONS ...
Страница 714: ...Chapter 26 Technical Specifications P446SV 682 P446SV TM EN 1 ...
Страница 741: ...APPENDIX A ORDERING OPTIONS ...
Страница 742: ...Appendix A Ordering Options P446SV P446SV TM EN 1 ...
Страница 744: ...Appendix A Ordering Options P446SV A2 P446SV TM EN 1 ...
Страница 745: ...APPENDIX B SETTINGS AND SIGNALS ...
Страница 746: ...Appendix B Settings and Signals P446SV P446SV TM EN 1 ...
Страница 954: ...Appendix B Settings and Signals P446SV B208 P446SV TM EN 1 ...
Страница 955: ...APPENDIX C WIRING DIAGRAMS ...
Страница 956: ...Appendix C Wiring Diagrams P446SV P446SV TM EN 1 ...
Страница 960: ......
Страница 961: ......