background image

© 2016 General Electric Company. All rights reserved.

Please read these instructions carefully BEFORE this 
instrument is installed or maintained.
These converters are intended for use in industrial 
compressed air systems only. Ensure that adequate 
pressure relief provision is installed if application of system 
supply pressure could cause downstream equipment to 
malfunction. Installation should be in accordance with 
local and national compressed air and instrumentation 
codes.
Products certified for use in explosion-proof or intrinsically 
safe installations MUST:
a)  Be installed in accordance with local and national codes 

for hazardous area installations, and in accordance 
with this manual.

b)  Only be used in situations which comply with the 

certification conditions stated in this handbook.

c)  

Only be maintained by qualified personnel with 
adequate training on hazardous area implementation. 
Before using these products with fluids other than air or 
for non- industrial applications consult GE.

Installation

Do not use for air pressures exceeding 250 psi.
Prior to installing, clean all lines thoroughly to remove 
all dirt, scale or other foreign matter. Install the lock-up 
valve in the controller output line as near to the control 
valve diaphragm chamber as possible, holding the 
number of connections to a minimum—so that the air 
flows through the body in the direction indicated by the 
words INLET and OUTLET marked on the underside of 
valve body.

The signal pressure line should be connected upstream 
of the air supply regulator to provide effective response 
of the lock-up valve in the event of air failure. Be sure all 
pipe connections are tight.

Do not install this Air Lock-up Valve in air lines 
which exceed 250 psi (1.72 MPa, 17.2 bar) pressure. 
 

 

CAUTION

CAUTION

WARNING

DANGER

CAUTION

CAUTION

WARNING

DANGER

Adjustment

The lock-up valve is normally factory set (i.e., 20 psi for 
3-15 psi operation or 35 psi for 6-30 psi operation) and 
should not require adjustment. If, however, it becomes 
necessary to adjust the setting an air supply, with a 
gauge and regulator, should be piped to the signal 
pressure connection after: (1) relieving compression on 
the range spring of the lock-up valve; and (2) connecting 
the instrument output line to the inlet connection of the 
lock-up valve. 

Instrument output pressure need be sufficient only to 
determine the open and closed position of the lock-up 
valve. Turn the air supply pressure on until the pressure 
gauge indicates the desired set pressure, then turn the 
adjusting screw down until no air pressure may be felt 
coming from the outlet of the lock-up valve. The valve 
will be fully closed at this point. 

Finally, tighten the adjusting screw locknut and connect: 
(1) the lock-up valve outlet connection to the control valve 
diaphragm chamber; and (2) the signal pressure line to 
the signal pressure connection of the lock-up valve. Turn 
on and set the air supply to operating pressure. Be sure 
that all pipe connections are tight.

4  |  GE Oil & Gas

Содержание Masoneilan 77-6

Страница 1: ...GE Oil Gas GE Data Classification Public Masoneilan 77 6 Model Air Lock up Valve Instruction Manual ...

Страница 2: ...ULAR REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET IN CONNECTION WITH INSTALLATION OPERATION OR MAINTENANCE SHOULD FURTHER INFORMATION BE DESIRED OR SHOULD PARTICULAR PROBLEMS ARISE WHICH ARE NOT COVERED SUFFICIENTLY FOR THE CUSTOMER OPERATOR S PURPO...

Страница 3: ...te Indicates important facts and conditions About this Manual The information in this manual is subject to change without prior notice The information contained in this manual in whole or part shall not be transcribed or copied without GE s written permission Please report any errors or questions about the information in this manual to your local supplier These instructions are written specificall...

Страница 4: ... by the words INLET and OUTLET marked on the underside of valve body The signal pressure line should be connected upstream of the air supply regulator to provide effective response of the lock up valve in the event of air failure Be sure all pipe connections are tight Do not install this Air Lock up Valve in air lines which exceed 250 psi 1 72 MPa 17 2 bar pressure CAUTION CAUTION WARNING DANGER C...

Страница 5: ...e inlet valve out of body insert Check all ports to be sure they are clear of dirt Inspect the diaphragm S A for rupture or for damage around the edge If necessary install a new diaphragm S A Check the inlet valve for wear If the inlet valve is roughed up or pitted replace with new one To reassemble the lock up valve perform all operations in reverse order to that used in disassembly Note The O ri...

Страница 6: ... 2016 General Electric Company All rights reserved 6 GE Oil Gas Notes ...

Страница 7: ... 2016 General Electric Company All rights reserved Masoneilan 77 6 Model Air Lock up Valve Instruction Manual 7 Notes ...

Страница 8: ...Phone 7 495 585 1276 Fax 7 495 585 1279 SAUDI ARABIA Phone 966 3 341 0278 Fax 966 3 341 7624 SINGAPORE Phone 65 6861 6100 Fax 65 6861 7172 SOUTH AFRICA Phone 27 11 452 1550 Fax 27 11 452 6542 SOUTH CENTRAL AMERICA AND THE CARIBBEAN Phone 55 12 2134 1201 Fax 55 12 2134 1238 SPAIN Phone 34 93 652 6430 Fax 34 93 652 6444 UNITED ARAB EMIRATES Phone 971 4 8991 777 Fax 971 4 8991 778 UNITED KINGDOM Brac...

Отзывы: