GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
8-198
Section 8-50 - Replacement of LOGIQ P9 ROTATION MODULE KIT
Section 8-50
Replacement of LOGIQ P9 ROTATION MODULE KIT
8-50-1
Manpower
1 person, 30 minutes
8-50-2
Tools
Standard Phillips Screwdriver, Nipper, Torque wrench: Needed HEX wrench - 4mm HEX wrench (For
M5 HEX Screw), Needed force - 60 Kgf·cm (For screw tighten force), Monkey Spanner (For NUT M4),
Hot air blower or Electric hair dryer
8-50-3
Removal Procedure
1) Remove the Monitor, Monitor Arm and OPIO Assy.
2.) Unlock cable clamp and carefully pull down 3 cables.
3.) Unscrew 1 screw and remove the cable clamp, and then extract out the 5 cables through the hole
of OPIO BASE.
OPIO BASE
5 CABLES
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...