GE
Direction 5370626-100, Revision 18 LOGIQ e/LOGIQ e Vet/LOGIQ i/Vivid e Basic Service Manual
Chapter 8 Replacement Procedures
8-15
8-3-2 Loading the System Software with USB Memory Stick
10.)Press any key to reboot system. When system first time boot up after upgrading complete, wait
until the below screen displays. Select the package and select “Next“ to run the application; or
to abort, select “shutdown“ to shut down the system.
NOTE:
For LOGIQ e R5.x.x and R6.x.x, please select a package to run the application.
NOTE:
When doing an option A (full reload) on a N&N or ED units or when selecting Americas presets
for a N&N or ED units, the Service Engineer needs to call OLC for temp General Key to allow
system to boot up fully and then select Ctrl+Alt+P and change to appropriate package
Figure 8-19 Package selection message
For Emergency&Critical
For Nerve&Needle
For General Imaging