Preliminary 

 

While every precaution has been taken to ensure the completeness 
and accuracy of this document, 

GE Digital Energy 

 IMV 

assumes 

no responsability nor liability for damages or errors resulting from the 
the use of the information contained in this document.

 

 

 

After unpacking the UPS(s) check carefully for any visible 
damages, which could have occurred during transport. 
Do never try to startup a UPS which shows mechanical or 
electrical damage. Contact your next service centre for help.  
 

 

The following material accompanies the UPS: 

 

The UPS operating manual. 

 

The PIOR of this UPS. (Putting into operation report) 

 

4 Bottom panels which are removed for transport. 

 

A plastic bag, containing: 3 Battery fuses, 6 cable ties 
for the fastening of input and output cables and  
5 Eyelet terminals for the connection of Neutral and 
Earth cables to the Input / Output section of the UPS. 

 
 

The description for the installation and startup of the UPS is 
based on a STANDARD CONFIGURATION, i.e. single UPS 
with integrated Battery and single Mains (Utility) input. 
A description of procedures in case of a parallel system or 
external Batteries follows seperately this basic instructions. 
Before paralleling UPS’s they must have been running as 
single units. 
 
 
Description of the install procedure for optional equipment: 

 

Separate Mains input: See operating manual, chapter 
4.8.2., page 31. 

 

External Battery cabinet: See operating manual 
chapter  7.2, page 65. 

 

For a description of procedure for the paralleling of UPS’s, 
refer to the document: 
“Installation guide for the RPA kit” 
 

Содержание Lanpro 33

Страница 1: ...tal Energy LanPro 33 Installation and commissioning guide Purpose of this document is to be a guide for the person in charge involved in the installation and the startup of the UPS as a step by step procedure ...

Страница 2: ...tic bag containing 3 Battery fuses 6 cable ties for the fastening of input and output cables and 5 Eyelet terminals for the connection of Neutral and Earth cables to the Input Output section of the UPS The description for the installation and startup of the UPS is based on a STANDARD CONFIGURATION i e single UPS with integrated Battery and single Mains Utility input A description of procedures in ...

Страница 3: ... Battery 10kVA 500x780x 1280 113kg 247kg 20kVA 500x780x 1280 140kg 372kg 30kVA 660x780x 1280 172kg 520kg Panel remove Frontpanel Pressed on remove with screw driver Sidepanels Fixed wit 3 Allen screws on each side Bottom Panels Front and Rear Pressed on Side Fixed with 2 Allen screws each side ...

Страница 4: ...to previous page in metering and alarms or in edit mode change value menu Commands Reset Lamptest Parameters ok Press to execute a command or enter in edit mode to change Parameters Confirm change of Parameter Consult the operating manual for a detailed descriptions of the displayed pages and a listing of alarms and messages and descripton of their particular meaning ...

Страница 5: ...utput connection Cable sections European standard Input Output 10kVA 20kVA 30kVA 5 x 4 mm2 5 x 10 mm2 5 x 10 mm2 Use the eyelet terminals from the plastic bag for the connection of Neutrals and Earth to Input Output ...

Страница 6: ...5 UPS Frontview with Frontdoor open ...

Страница 7: ...e Sidepanes to take them off See page UPS cabinet Before making any connections we recommand a thorough mechanical check including verification of loose bolts or components correct inserted plugs and no loose wires or cables Make sure fans spin freely If any problems with this installation are found that pose a threat to persons or equipment do not proceed until the problem has been corrected Inst...

Страница 8: ... of certain functions and values of the UPS If not otherwise specified the UPS will leave the factory in a standard configuration which corresponds to the values in the attached PIOR Verify if this values conform to the actual situation on site and if necessary adapt Important Keep the PIOR updated whenever Parameter s are changed To access Parameters Go in the menu to the page PARAMETER MENU User...

Страница 9: ...t Manual Battery test Commands Inverter ON Local Remote Both Input filter Rectifier input voltage Mains filter Bypass voltage Sync filter Alarm not synchronizerd The delay time in seconds installed in one of the above Parameters has effect on the signals from the Panel the events memory and the Customer Interface Programming of the 6 output relays on the Customer Interface Programming of the 2 inp...

Страница 10: ...ns voltage 230V Press again simultaneously keys metering and to start the Booster which will bring the DC Voltages up to 400 Volt Verify again in metering for UDCP and UDCN show a correct reading of these voltages Go now in the menu to Inverter ON OFF page and start the Inverter Verify in measurements for correct voltages 220 230 240 Volt Compare with PIOR Press Inverter ON a second time to activa...

Страница 11: ...nding of the Buzzer and the blinking yellow LED End of startup in Service mode Shutdown of UPS in Service Mode If everything ok press the button Total OFF to shutdown Booster Inverter and SSM and open the contactors K4 K6 and K7 Before proceeding to normal startup with Q1 closed discharge the Capacitors of the DC Link either by starting the Inverter switch off after discharge or wait until the rea...

Страница 12: ...r corresponding values of Mains voltage and Load voltage Close Battery fuses and verify Battery voltage and Battery charging current If possible connect some Load and take note of the amount of Load for each phase Load distribution Yellow LED on frontpanel is lit Choose in menu page Inverter ON OFF and start the Inverter After transfer of the output to Inverter the green LED is lit indicating Load...

Отзывы: