GE JVW5301, JVW5361 Скачать руководство пользователя страница 4

4

31-10983

REMOVE THE PACKAGING

CAUTION:

 

Wear gloves to protect 

against sharp edges.
•  Remove the duct covers.
•  Remove the hardware bag, literature package 

and other boxed parts.

•  Remove and properly discard the protective 

plastic wrapping and other packaging materials.

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)

Wire cutter/stripper

Spirit level

Aluminized 

Duct tape

Safety glasses

Strain relief for 

junction box

Electric drill, #2 Phillips, 

flat head, and 9/32" drill bit

UL listed wire nuts

Pencil and tape measure

PLAN THE INSTALLATION

CAUTION:

 

To reduce risk of fire and to 

properly exhaust air, be sure to duct the air 

outside – Do not vent exhaust air into spaces 

within walls or ceilings or into attics, crawl spaces, 

or garages.

PARTS SUPPLIED FOR INSTALLATION

•  1 Hardware Package

• 1 Literature Package

PARTS NEEDED FOR INSTALLATION

•  1 Strain Relief

• Power Supply Cable

• 1 Wall or Roof Cap (for external venting only)

• All Metal Ductwork (for external venting only)
• Recirculation Duct (for recirculation install only)

WARNING: 

PERSONAL INJURY HAZARD

Because of the weight and size of the range hood 

canopy. It is recommended that 2 people are used 

to install the range hood. Failure to properly lift 

range hood could result in damage to the product 

or personal injury.

NOTE: 

This range hood can be installed as either 

ducted or recirculation. In a ducted application, 

this range hood can be vented through the wall or 

ceiling. When installed for recirculation, the range 

hood vents out the sides of the duct cover. 

NOTE: 

Before making any cuts or holes for 

installation, determine which venting method will 

be used and carefully calculate all measurements.

INST

ALL

ATION PREP

ARA

TION

Installation Preparation

Содержание JVW5301, JVW5361

Страница 1: ...tag to the service panel CAUTION Due to the weight and size of these vent hoods and to reduce the risk of personal injury or damage to the product TWO PEOPLE ARE REQUIRED FOR PROPER INSTALLATION Pyram...

Страница 2: ...e depends upon ceiling height and duct cover limitations The telescopic duct cover conceals the ductwork running from the top of the hood to the ceiling For supplied duct cover ceiling heights see tab...

Страница 3: ...an result in a risk of electric shock Check with a qualified electrician or service representative if you are in doubt whether the appliance is properly grounded ADVANCE PLANNING Duct Install Planning...

Страница 4: ...INSTALLATION 1 Hardware Package 1 Literature Package PARTS NEEDED FOR INSTALLATION 1 Strain Relief Power Supply Cable 1 Wall or Roof Cap for external venting only All Metal Ductwork for external vent...

Страница 5: ...py Mounting Anchors I Duct Cover Anchors RANGE HOOD RECIRCULATION COMPONENT Recirculation Duct Required Min Recommended Max Ceiling Height Examples x 24 x 36 Min Min 7 3 1 4 8 3 1 4 Max Max 7 10 5 16...

Страница 6: ...2 holes for installation with a 9 32 drill bit and insert the duct cover anchors 6 Determine and mark where the hole will be drilled for the power supply cable to be run through the wall Mark a point...

Страница 7: ...perly discard the protective plastic wrapping from the hood and grease filters 3 Remove junction box cover Vented Installations 1 Securely press damper on top of the exhaust opening Check that the dam...

Страница 8: ...abs forward on the lower duct cover Angle the duct cover to slide the tabs under the ledge of the hood body Seat the back of the duct cover on the top of the range hood between the edges and tabs 5 Tu...

Страница 9: ...da os al producto SE NECESITAN DOS PERSONAS PARA REALIZAR UNA INSTALACI N CORRECTA 991 0364 803 rev 2 31 10983 1 04 15 GE Campanas de Ventilaci n de Chimeneas de Pared Pir mide JVW5301 JVW5361 ADVERT...

Страница 10: ...limitaciones de la cubierta del conducto La cubierta plegable oculta los conductos que van desde la parte superior de la campana hasta el cielorraso Para las alturas de cielorraso de las cubiertas de...

Страница 11: ...ro de corriente es indicada en la secci n de Preparaci n de la Pared en la p gina 6 SUMINISTRO DE ENERG A IMPORTANTE Tenga a bien leer cuidadosamente ADVERTENCIA PARA SEGURIDAD PERSONAL ESTE APARATO D...

Страница 12: ...muy bajos o garajes PIEZAS PROVISTAS PARA LA INSTALACI N 1 Paquete de Herramientas 1 Paquete Escrito PIEZAS NECESARIAS PARA LA INSTALACI N 1 Amortiguador de Refuerzo Cable de Suministro de Corriente...

Страница 13: ...Campana I Soportes de la Cubierta del Conducto COMPONENTES DE RECIRCULACI N Conducto de Recirculaci n 13 9 7 8 36 X 18 1 2 Para realizar instalaciones en cielorrasos altos el Kit de Cubiertas de Cond...

Страница 14: ...alaci n con una broca de 9 32 e inserte los sostenes de la cubierta del conducto 6 Determine y marque el lugar donde el agujero ser perforado para que el cable de suministro de corriente pueda pasar a...

Страница 15: ...etire la tapa de la caja de empalmes Instalaciones Ventiladas 1 De forma segura presione el regulador que se encuentra sobre la abertura del escape Controle que el regulador se pueda abrir libremente...

Страница 16: ...ubierta del conducto para deslizar las leng etas debajo del estante del cuerpo de la campana Apoye la parte trasera de la tapa del conducto sobre la parte superior de la campana de la cocina entre los...

Отзывы: