Hydran* M2-X Installation Guide
Page 26
MA-028
Rev. 2.1,
11-Jun-20
Installing the Cables
Figure 22: Removing the Hydran M2-X Cover
Installing the Cable Conduits and Gland Fittings
GE Recommendations prior to installation:
•All cables carrying; Power, Communications, analogue inputs and outputs,
must be run in either rigid steel conduit or flexible steel liquid tight armoured
conduit, with a minimum rating of IP56.
•Using flexible stee
l armoured conduit makes it easier during installation and
servicing of the Hydran M2-X.
• All terminating connecting gland fittings to the Hydran M2
-X must be liquid
tight or at a minimum have an IP56 rating, with locknuts and sealing gaskets
•The steel
provides shielding against magnetic fields.
1. Remove four retaining screws (using
supplied Allen key), 4 lock washers
and 4 flat washers.
2. Pull out cover.