![GE Hart Druck RTX 1000H Series Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/ge/hart-druck-rtx-1000h-series/hart-druck-rtx-1000h-series_user-manual_132834030.webp)
RTX 1000H series user manual
K0297 Issue 2
3-10
3.10 System Checks
Leak test
Before the system is filled and/or commissioned, do a leak test with
compressed air (or other inert compressed gas) or water. The minimum test
pressure must be equal to the normal operating pressure. The maximum
pressure is the MWP.
•
Apply pressure at a convenient point on the system.
•
Apply an applicable leak test solution to the impulse piping, valves,
transmitter connections and joints.
•
Look for a continuous stream of bubbles.
•
Bleed the system.
•
Do all the necessary repairs, and test the system again.
•
Return the system to the original configuration.
Transmitter test
Connect the necessary instruments to monitor the pressure signal. If
necessary, connect a milliammeter to measure the output from the transmitter.
•
Apply power to the transmitter.
•
Apply the applicable pressure.
•
Monitor the pressure signal.
Refer to the 'Operation' section for the procedures to set up and operate the
transmitter.
Содержание Hart Druck RTX 1000H Series
Страница 1: ...Druck RTX 1000H series HART Pressure transmitter User manual K0297 GE Sensing Inspection Technologies ...
Страница 2: ......
Страница 4: ......
Страница 12: ...RTX 1000H series user manual K0297 Issue 2 1 2 Figure 1 2 Transmitter schematic diagram ...
Страница 20: ...RTX 1000H series user manual K0297 Issue 2 2 6 ...