g
GE
OPM_SGS_ISG_M22_M30_0US_V011.doc
13/38
Installation
Guide
SG Series
225 & 300 kVA
Openings for input and output cable connections
SG
S_2
25-
300
_UP
S v
iew
top
_01
US
1,650mm
64.96"
160mm
6.30"
2.7
6"
40mm
1.58"
70m
m
31.
50"
21.
66"
550
mm
800
mm
Utility input
Output Load
Battery
Fig. 3.4.1-2 Opening on top of the cabinet for input and output cables
Utility input
Output Load
6.30"
160mm
1.77"
550
mm
21.
66"
800
mm
31.
50"
100
mm
3.9
4"
1,650mm
64.96"
SG
S_2
25-
300
_UP
S v
iew
bo
ttom
_02
US
45mm
Fig. 3.4.1-3 Opening on the bottom of the cabinet for input and output cables
SG Series
openings are
provided on the top and
the bottom of the UPS
for the connection of
input and output cables.
Pay attention to the
position of these
openings, when
choosing the placement
of the UPS.
These openings are
covered with a
protective plate.
Fixing of the UPS cabinet on the floor
The UPS cabinet is free standing and normally does not require to be bolted to the floor.
The UPS cabinet can be fixed however to the floor by bolting it with the supporting blocks to the
floor.
See
Fig. 3.4.1-4
.
62.205"
1580mm
35mm
71
3m
m
28
.0
71
"
60
m
m
2
.363
"
60mm
2.363"
68
0m
m
26.772"
1.378"
1.378"
35mm
=
=
SGS_225-300_UPS view bottom_02US
Ø 0.47305"
Ø 12mm
Front side
Fig. 3.4.1-4 Fixing of the UPS cabinet on the floor