GFK-3000A
IC695ACC403 Quick Start Guide
8
5
Initial Power-up
When 24Vdc power is first applied to the Energy Pack,
the power-up process goes through the following steps:
1.
The IN LED turns on green.
2.
The Energy Pack performs a self-diagnostic
test. If this test passes, output power to the
Controller is turned on and the OUT LED turns
on green.
3.
Charging of the CapPack begins and the STAT
LED blinks green.
4.
When charging of the CapPack is complete, the
STAT LED turns on solid green and the Energy
Pack signals to the controller that it can start
run-time operation. The Controller will not start
running its application until the Energy Pack
signals that it is fully charged.
Figure 6: LEDs on CAP Pack
Содержание GFK-3000A
Страница 17: ......