9
User Manual V1.0-2022-05-10
04 Check and Storage
4 Check and Storage
4�1 Check Before Receiving
4�2 Deliverables
Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and others
signs of equipment damage. Do not unpack the package and contact the supplier as soon as
possible if any damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact
the supplier as soon as possible if any damage is found.
Inverter *1
PV box *1
(optional)
Mounting
plate *1
MC4 PV
connector *N
Screws *N
PIN terminal *N
Documents *1
COM module *N
PE cable OT
terminal *1
AC cable OT
terminal *6
Expansion bolts
*N
PV box mounting
plate *1
(optional)
COM connector
*N
Screwdriver *1