G30 Generator Protection System
GE Multilin
3.1 DESCRIPTION
3 HARDWARE
3
The torque used to connect the terminal blocks to the back of the relay chassis (screws a, b, c shown) is 9 inch-pounds. For
the connections to the terminal blocks (rows 1 to 8), use a minimum of 17 inch-pounds. During manufacturing, the power
supply and CPU modules are installed in slots B and D of the chassis with 13 inch-pounds of torque on the screws at the
top and bottom of the modules.
Содержание G30
Страница 10: ...x G30 Generator Protection System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 G30 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 414: ...5 274 G30 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 456: ...8 2 G30 Generator Protection System GE Multilin 8 1 DIRECTIONAL PRINCIPLE 8 THEORY OF OPERATION 8 ...
Страница 470: ...9 14 G30 Generator Protection System GE Multilin 9 1 SETTING EXAMPLE 9 APPLICATION OF SETTINGS 9 ...
Страница 484: ...11 12 G30 Generator Protection System GE Multilin 11 6 DISPOSAL 11 MAINTENANCE 11 ...
Страница 512: ...A 28 G30 Generator Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Страница 620: ...B 108 G30 Generator Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Страница 666: ...E 10 G30 Generator Protection System GE Multilin E 1 IEC 60870 5 104 APPENDIX E E ...
Страница 678: ...F 12 G30 Generator Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Страница 687: ...GE Multilin G30 Generator Protection System H 7 APPENDIX H H 2 ABBREVIATIONS H Z Impedance Zone ...