26
Entellisys Low Voltage Switchgear
Chapter 4. Equipment Installation
If studs or anchor bolts are to be used, they should be
installed in the foundation as it is poured. It is important
that the studs or bolts are spaced to agree with
dimensions given on the General Electric job drawings.
The dimensions between anchor bolts for a particular
installation are dependent upon the configuration of
equipment ordered. The dimensions shown on Fig. 4-2
cover all of the standard enclosures available for
Entellisys Switchgear.
Fig. 4-3 illustrates the space available for conduit and/or
cable entrance through the bottom or top of each
equipment section. The space required for control wiring
entry to the optional wiring trough is also shown.
NOTE:
BUS COMPARTMENT
BARRIER LOCATION - WHEN
THIS OPTION IS PROVIDED, IT
REDUCES AVAILABLE SPACE FOR
CABLES
ABOVE
BY (5) INCHES
Equipment
Depth “A”
Direction
of Leads
B
60” non-fused or
Below
19
67” with fused EGF-08/16
Above
24
67” non-fused or
Below
26
74” with fused EGF-08/16
Above
31
74” non-fused or
Below
33
81” with fused EGF-08/16
Above
38
Fig 4-3. Floor plan and cable entry space