
g
GE
OPM_SGS_ISG_10K_40K_0US_V010.doc
27/45
Installation
Guide
SG Series
10, 20, 30 & 40 kVA
3.8.2 Power connection with common input utility of
SG Series
10 and 20 kVA
S
G
T
500
0_0
10-
0
20_
UP
S
c
o
nne
ct
ion
c
omm
on_0
1US
N
L1-1
IN
P
U
T
LOA
D
PE
L3-1
L2-1
N
L2
L1
L3
RE
C
TIFIER
X1
PE
Fig. 3.8.2-1 Power connections Common Input Utility of
SG Series
10 and 20 kVA
SG Series
10 and 20 kVA
:
Max. rating
X1
terminals:
3 AWG
(25mm
2
)
Common Input Rectifier / Bypass
L1-1
Rec Bypass Phase A
L2-1
Rec Bypass Phase B
L3-1
Rec Bypass Phase C
N
Neutral (Bypass)
PE
Ground
Output Load
L1
Load Phase A
L2
Load Phase B
L3
Load Phase C
N
Neutral
PE
Ground
The interconnection links
BR1
,
BR2
and
BR3
must remain connected
.
Cable terminations are to the
Rectifier Input Terminals
and
Output Terminals
as shown above.
Connect wire to the
Terminals
using appropriate tools and appropriate torque.
Torque specification for
Input / Output
and
DC
power connections on
Terminals
:
Section 3.8.1
.
This UPS is only designed to operate in a wye-configured electrical system
with a solidly grounded neutral.
If the UPS is equipped with an input transformer, the secondary of the
transformer must be wye-configured with neutral solidly grounded.