Installation
Guide
SG Series
10, 20, 30 & 40 kVA
SG Series
30 & 40 kVA
How to access the terminals for the cable connections.
D
Bottom entry cables
Top entry cables
S
G
T5
00
0_
030
-0
40
_U
P
S
c
onn
ec
tio
n_
01
U
S
A
B
C
Fig. 3.8.1-2 Access to the input / output connections of
SG Series
30 and 40 kVA
To access input, output and Battery connections proceed as follows:
•
Remove protection panel “
A
”.
•
Remove protection panel “
B
”.
•
Remove UPS side panel “
C
”.
•
Only from
Separate Input Utility
:
Remove with appropriate tool the metallic window “
D
” from the metal screen “C”.