LX: OPM_LPU_11U_5K0_10K_1US_V030
36
GE DE LP 11U UPS: Installation / User Manual 3.0 (US)
Digital Energy
™
LP Series
g
7.1 Extended
Runtime
Extended runtime versions are equipped with additional separate battery packs to increase the runtime of the
unit. Additional batteries will increase the recharging time for the unit. All other operational information is the
same.
If a battery pack is connected, the UPS must be informed about the new total battery capacity to allow a reliable
recalculation of the available run time. Please refer to section 5.3.4 ‘Set-up Menu’. Dependent of the charge
condition of the new batteries the new run time calculations may temporarily be unreliable.
Connecting an external charger may cause damage to the UPS. As the batteries are not galvanically separated
from the utility input, the external charger must be galvanically separated from the utility. Using an external
charger will cause a false run time prediction during charging time, the correct run time will be shown 10 hours
after reaching battery float charge. If you are in doubt, contact your dealer.
Battery pack A: 240V / 7 Ah
Battery pack B: 240V / 14 Ah
Batt.
cap. of
tot. cap.
runtime (minutes), at 100% / 50% load
pack(s)
batt. pack(s)
incl. internal
(Ah)
battery
(Ah)
5-11 6-11 8-11 10-11
5/6-11 8/10-11
-
-
7 12
10/25 8/20 11/29 8/22
A
7
14 19
25/60 21/50 22/50 16/39
B
14
21 26
45/90 35/75 33/70 25/57
A+B
21
28
33
60/120
50/100
44/90
34/70
B+B
28
35 40
80/150 65/130 55/110 43/90
For more information please refer to the
NOTES
in section 4.5.5 step 6.
7.2 Plug-in
Cards
An option slot (rear panel, 13) allows easy installation of a relay or SNMP plug-in card. See sections 6.3 and
6.4 for more information.
7.3 RPA-Facility (Redundant Parallel Architecture)
Nowadays there are many mission-critical applications that need a fault tolerant, 100 % reliable availability of
mains power. By adding the RPA-facility to the UPS (rear panel, 14), highest standards for reliability can be
met. The RPA-facility allows to connect 2, 3 or 4 units in parallel.
Connecting GE Digital Energy™ LP-U units in parallel is attractive for several reasons.
Redundancy
: To achieve the highest possible level of power protection in a fault-tolerant network.
By connecting units in parallel, using the N+x system, a redundant system can be created. In this case all the
UPSs equally share the load in the system during normal operation. In this way every possible single point of
failure will be eliminated. This means that if one of the UPSs in the parallel system fails, the other(s) can still
supply the load guaranteeing full protection without any interruption.
Scalability:
To add power if needed without investments beforehand.
Another reason for paralleling units is upgrading the power rating of the system. If e.g. a LP 5kVA is installed,
the power rating can be upgraded to 10kVA by adding another LP 5kVA in parallel. This spread investment
makes sure that you don’t have to invest in advance, but only when you need to.
GE’s
unique RPA system has the following major advantages:
•
RPA offers true redundancy because not only the power electronics are redundant, but also the
batteries, the bypass circuit and the control logic,
•
The RPA system is an option: you don’t have to buy it if you don’t need it.
7 - Optional Features