
DGT DISTRIBUTED GENERATION TRIP CONTROL SYSTEM – INSTRUCTION MANUAL
5–47
DGT Distributed Generation Trip
Control System
Chapter 5: Operation
GE Consumer & Industrial
Multilin
Operation
Initial power-up
When primary power is applied to the DGT-U, DGT-R or DGT-D, the device is ready for
configuration or if already configured, for in service operation. Once power is applied
check for normal operation by confirming that the red PWR (Power) LED is lit continuously.
If not, please re-check all power wiring.
If configuration of the DGT device is necessary, please refer to Chapters 3 and 4 for
information.