Installation Instructions
5 INSTALL CEILING BRACKET
The ceiling bracket must be installed when the duct
cover is used to span 24 or more height above the
hood. The bracket will hold the decorative duct cover
in place at the top.
Note:
The ceiling bracket is not required when using
only the 12 section of the duct cover.
• Install the 2 small screws into the sides of the duct
bracket. Remove the screws. Pre-tapping the holes
will insure ease of final installation.
• Match center notch on the bracket to the centerline
on the wall and flush against the ceiling.
• Mark the 2 screw hole locations.
• Drill 1/8 pilot holes in marked bracket location.
• If pilot holes do not enter studs, enlarge the holes to
3/8 and install wall fastener anchors.
• Secure the bracket to the rear wall with wood screws
and washers. Use wall anchors if needed.
6 CONNECT DUCTWORK
• Push duct over the end of the transition until it
reaches the stop tabs.
• Install ductwork, making connections in direction of
airflow as illustrated.
• Secure joints in ductwork with sheetmetal screws.
• Wrap all duct joints with duct tape for an airtight
seal.
• Use duct tape to seal the flange connection.
CAUTION:
Do not use sheet metal
screws at the transition to ductwork connection.
Doing so will prevent proper damper operations.
Seal connection with tape only.
Screw
Duct Tape
Over Seam
and Screw
Air Flow
Duct Tape
Over Flange
Duct
Stops
Note:
Bracket has 2 sets of holes. Use larger holes for wall
fasteners or wood screws with washers. Use smaller holes for
wood screws with washers.
See Step 9
to Install
Duct Cover
Install
Ceiling Bracket
When Duct
Cover is
Used to Span
24" or More
Ductwork
Transition
Duct Tape
Only for Proper
Operation
of Damper
House Ductwork
16
″
″
″
″
Содержание Cafe CV936MSS
Страница 20: ...20 Consumer Support Troubleshooting Tips Operating Instructions Safety Instructions Care and Cleaning Notes...
Страница 22: ...22...
Страница 46: ...22...