Becker VRP-SB-PID Series Natural Gas Controllers Instruction Manual | 36
© 2016 General Electric Company. All rights reserved.
Bracket Mounting
(Figures 20-22)
Step 34: Take the VRP-SB-PID that you assembled after step 33
and turn “right side up” again. Mount the PID to the Bracket (CCCC)
using 2, SS 3/8 Washers (DDDD), SS 3/8 Lockwashers (EEEE), and
3/8-16 x 3/4 HHCS (FFFF).
Figure 20
FFFF
DDDD
CCCC
EEEE
VRP-SB-PID-40
Figure 21
CCCC
FFFF
DDDD
EEEE
VRP-SB-PID-80
Figure 22
FFFF
DDDD
EEEE
VRP-SB-PID-125
CCCC