![GE Autosampler Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/ge/autosampler/autosampler_quick-start-manual_128027004.webp)
ENGLISH
QUICK START GUIDE
2014 General Electric Company. All rights reserved. DQS 88000-03_MUL Rev A (MC13-110)
4
STEP 1: Unpack and Inspect the GE Autosampler
STEP 2: Complete the Identification Records
Enter the serial number of your GE Autosampler on page 3 of the
Sievers InnovOx Laboratory Operation and Maintenance Manual
.
STEP 3: Select a Location
Place the GE Autosampler to the left of an installed Analyzer
on a clean, unobstructed surface that can accommodate
the dimensions and weight detailed in the Specifications
Summary. Place the front of the GE Autosampler parallel with the
front of the Analyzer. For proper heat dissipation, ensure that 16 cm
(6.3 in) is available at the rear and on both sides of the Analyzer.
Keep away from direct sunlight. For proper operation and to avoid
measurement errors, ensure that the environment temperature is no
greater than 40ª C (104ª F) or lower than 10ª C (50ª F).
STEP 4: Install the Stirring Plates (Optional)
Stirring plate rack
Stirring plate
Note:
All racks in a single protocol must be either 17 mL,
35 mL, 40 mL, or 60 mL.
STEP 5: Install the Rinse Station Tubing (Optional)
From reservoir to pump
From pump to reservoir
To waste
From water source
Routing for Rinse Station Tubing
STEP 6: Install the Racks
Insert each vial rack into the base of the GE Autosampler,
fitting the feet (located on the bottom of the vial rack) into the
corresponding slots.
Installed Vial Racks
STEP 7: Install the Needle Assembly
Installation Instructions
Under the GE Autosampler -
Stirring Plate Wiring
Under the Stirring Plate
Stirring Rack and Plate
Installation
Lowering Needle Mount