Installation Instructions
10
PREPARE THE AIR CONDITIONER
(continues)
Remove the shipping screws located on the top
of the case.
Remove the ground screws from each side of
the case. Keep them in a safe location.
NOTE: Be sure to save these screws. You will
need them later in the installation.
Slide the air conditioner from the case by
gripping the base pan handle and pulling
forward while bracing the case. Do not pull or
lift on the foam discharge area.
Your unit may come with internal packaging.
This packaging must be removed prior to
installing the air conditioner back into the
cabinet.
3
E
F
FRONT
Do not
pull or
lift in this
DUHD³
damage
to the
unit may
result
PREPARE THE CASE
Attach the top rail gasket to the bottom of
the top rail.
Install the top mounting rail with 4 type A
screws from the inside of the case. Press firmly
to drive the screws into the gasket and through
the top mounting rail.
Slide each side retainer onto the edge of
each according panel. The figure shows the
orientation of each accordion panel and side
retainer assembly relative to the case from a
top view of the unit.
Remove the backing from the accordion
seal (two short strips). Stick one sealing strip
respectively on the left side and right side of
the accordion panels, as shown.
A
Top mounting rail
B
4
G
H
C
D
WINDOW FILLER PANEL
WINDOW FILLER PANEL
SIDE RETAINER
SIDE RETAINER
Содержание Appliances AEM24
Страница 32: ...32 Notas ...
Страница 33: ...33 Notas GEAppliances com ...