Action
Step
Connect the syringe to the purge valve on the right pump head of System
pump B, and repeat steps 6 to 8. Keep the system flow running.
9
Validate purge of pump B
Follow the instructions below to check that there is no air left in the pump after performing
a purge.
Action
Step
In the Process Picture:
1
•
Click on the Injection valve and select Manual load.
Result: The Injection valve switches to manual load position.
96
ÄKTA pure Operating Instructions 29022997 AF
4 Installation
4.5 Prime inlets and purge pump heads